Installation Guide

Basement Door Accessories
Keyed Lock Kit
Enjoy the convenience of locking and unlocking your Classic
Series BILCO basement door from the outside with a base-
ment door keyed lock kit. Install a BILCO keyed entry lock
and save the trip into the basement to lock or unlock the
door.
Weather Strip Kit
BILCO’S basement door weather strip kit is designed to
reduce gaps, and to block leaves, dirt, and pests from your
basement area way. The easy to install kit is supplied with
installation instructions.
BILCO Customer Service: (800) 854-9724 l Weekdays 9 AM to 5 PM EST
residential@BILCO.com l www.BILCO.com
Foundation Plates
Foundation plates can be used to improve an areaways ap-
pearance, cover rough masonry, reduce the inside areaway
width, or for side support in corner installations. Formed
plates are prime-painted steel and are now available with a
factory applied powder coat paint fi nish.
Stair Stringers for Basement Areaway
Stair stringers sizes are available for all BILCO Basement
Doors sizes. Constructed of heavy galvanized steel, BILCO
stair stringers for basement areaways are an economical
and more durable alternative to wood stair stringers for
your basement areaway.
How to correct installation errors or repair minor damage
Door not shedding water. If your BILCO basement door does not shed water, look for and correct these installation errors.
1. Header panel not caulked. The vertical seam between the header panel and side panels must be fully caulked on both
sides to ensure a weathertight assembly (see Step 3, Figure - 4).
2. Doors do not fully close. Stand on steps and slowly close each door to see if the bottom fl ange of one or both is bind-
ing on the concrete. Chip away or rub down excess concrete with mason’s stone so fl ange is not obstructed.
3. Sill not high enough. The masonry under the BILCO basement door should be 4” higher than the surrounding grade
and concrete should be level so water cannot accumulate in front of the sill.
4. Water seeping between steel and masonry. The unit should be caulked all around the exterior where the steel and ma-
sonry meet, as well as where the unit joins the building wall. If side pieces have been buried in concrete, the unit should
be removed and sidewalls recapped so assembly rests on top.
5. Blocked header channel. Make certain channel is clear of leaves, dirt, and debris. Any blockage in this channel will
cause water to overfl ow the header.