User's Manual
Table Of Contents
- CHAPTER 1 - INTRODUCTION
- CHAPTER 2 - PLANNING THE INSTALLATION
- CHAPTER OVERVIEW
- 2.1 PLANNING THE INSTALLATION
- 2.1.1 RECOMENDED STEPS FOR A SUCCESSFUL INSTALLATION
- 2.1.2 REQUIREMENTS
- 2.1.3 UNPACK EQUIPMENT
- 2.1.4 CHOOSING THE INSTALL LOCATION
- 2.1.5 PLAN DEVICE NETWORK
- 2.1.6 CHOOSE NETWORK TYPE
- 2.1.7 CHOOSE POWER SOURCE
- CHAPTER 3 - INSTALL SOFTWARE
- CHAPTER OVERVIEW
- 3.1 SECUREADMIN LITE SERVER
- Figure 3-1 Install Menu
- Figure 3-2 SecureAdmin Lite Server Installation Wizard
- Figure 3-3 SecureAdmin Lite Server License Agreement
- Figure 3-4 SecureAdmin Lite Server Choose Destination Location
- Figure 3-5 Database Selection
- Figure 3-6 Connecting to SQL Server option
- 3.1.1 REPAIRING AN INSTALLATION OF SECUREADMIN LITE SERVER
- 3.1.2 UNINSTALLING SECUREADMIN LITE SERVER
- 3.1.3 UPGRADING AN INSTALLATION OF SECUREADMIN LITE SERVER
- 3.2 SECUREADMIN LITE CLIENT
- Figure 3-9 Menu
- Figure 3-10 InstallShield Wizard
- Figure 3-11 Welcome Screen
- Figure 3-12 SecureAdmin Lite Client License Agreement
- Figure 3-13 SecureAdmin Lite Client Choose Destination Location
- Figure 3-14 Fingerprint Placement Feedback Option Selection
- Figure 3-15 InstallShield Wizard Finished
- 3.2.1 MODIFYING AN INSTALLATION OF SECUREADMIN LITE CLIENT
- 3.2.2 REPAIRING AN INSTALLATION OF SECUREADMIN LITE CLIENT
- 3.2.3 UNINSTALLING SECUREADMIN LITE CLIENT
- 3.2.4 UPGRADING AN INSTALLATION OF SECUREADMIN LITE CLIENT
- CHAPTER 4 - INSTALL HARDWARE
- CHAPTER 5 - SYSTEM START-UP PROCEDURES
- CHAPTER 6 - CONFIGURE DEVICE
- CHAPTER 7 - MAINTENANCE AND CLEANING
- CHAPTER 8 - TROUBLESHOOTING
- CHAPTER OVERVIEW
- 8.1 INSTALLATION ERROR MESSAGES
- CHAPTER 9 - NOTICES
- GLOSSARY
Part # 430-4G-050-00-004
© 2011 - L-1 Identity Solutions Inc. All rights reserved
Planning the Installation
2.1.7 CHOOSE POWER SOURCE
4G V-Flex Lite, CR-Pass and SecureControl devices can be powered by several methods:
12V DC regulated (4G V-Flex Lite, CR-Pass and SecureControl)
Power Over Internet (PoE) through an inline PoE 802.3af power injector (4G
CR-Pass only)
Power sources should be:
Isolated from other equipment
Filtered
Protected by an Uninterruptible Power Supply (UPS) or battery backup
Protected by a voltage suppression device if transient electrical surges are
an issue in the location.
When planning a system, know the power requirement of each device. If multiple devices are
to share a common power supply, exercise care to avoid excessive voltage loss on the wires.
Voltage loss can lead to communication problems when devices are talking and/or listening
on different ground references.
Voltage loss is directly proportional to wire resistance and the current the wire carries. Always
place the device as close as possible to the power supply and always select a wire size
appropriate for the load. 4G Lite devices run on DC power between 12 V and 24 VDC.
Power requirements for all 4G V-Flex Lite, CR-Pass and SecureControl models are listed
below: