Installation guide
11
‐‐‐‐‐‐‐‐‐90‐091Rev.1Mi niRaQ4GSecureSeries∙InstallationGuide
3. Installation 
Safety Precautions 
Safety Precautions 
For all MiniRaQ 4G Secure installation procedures, observe the following safety and handling rule to 
avoid damage to yourself and the equipment: 
Important 
 ___________________________________________________________________________________________________ 
Unpacking and Inspection 
1.  Inspect the shipping box for damage. If you find any damage, notify the shipping 
carrier immediately for all claims adjustments. 
2.  Once you have removed the unit from the box, disassemble all the components, as 
per the Quick Reference Guide, and compare these components to the parts list in 
Appendix C (page 18).  
3.  Visually inspect all parts to ensure there was no damage during shipping. If there is 
damage, notify the shipping carrier immediately for all claims adjustments. 
4.  If you find any shortages, contact your Black Hawk Labs sales representative. 
5.  Save the box and foam inserts in the event the unit must be returned. 
A dedicated ground stud is provided at the bottom left of the backplate. To 
ensure safety to all installation and operational personnel, connect a ground 
wire from this stud to earth ground using a minimum 14AWG in size. 
Cabinets must be mounted and wired per applicable sections of the 
National Electrical Code (NEC). 










