User Manual
12
EN
Step T6a
• Slide the torque tube bearings onto the torque tube
and glue them in place by placing a thin bead of CA
on the torque tube at the given locations (200mm,
226mm), then slide the bearings onto the CA. Do not
allow CA to get into the bearings.
• Use oil on the outside of the torque tube bearing
holders to ease installation into the boom.
• The stepped side of the washer faces the radial
bearing.
Tail rotor blade
removed for clarity
Step T5Step T5 parts (bag T6)
Step T6a parts (bag T7)
Tail Assembly cont’d
Button head screw
M3 X 5 (x2)
Cap head bolt M3 X 25
M3 Step washer (x4)
Control ball
M3 Lock nut
viewed from back
OIL
OIL
214 mm 226 mm 200 mm
Button head screw
M3 X 12 (x2)
M3 Lock Nut (x2)