Installation manual

Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided dishwasher
supply line.
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compression
fitting, or braided hose).
Electrical Supply Cable - Minimum #14AWG, 2 conductors, 1 ground, insulated copper
conductors.
90° elbow with 3/8" N.P.T. male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg.
UL listed conduit connector or strain relief.
Teflon tape or other pipe thread compound to seal plumbing connections.
Pipe Wrench
Wire Cutter Drill
Hole Saw
Hammer Wire Stripper
Tape Measure
Torx Screwdriver Phillips Screwdriver
Adjustable Wrench
Scot Screwdriver
Scissors
Level Brush Pencil
Slicone
Glue
2. TOOLS WHICH MAY BE NEEDED
3. MATERIALS WHICH MAY BE NEEDED
(Additional materials may be required to comply with local codes)
(T20)
3