Manual
95
INSTALLATION DIAGRAM
Specicationssubjecttochange.Seewww.bluesea.comforcurrentinformation.
A
B
1
112
3
12
C
2
23 45678910 11
From negative
DC distribution
(all loads and
sources)
Fuse
(5 Amp)
AC
Reverse connections
#11 and #12
if kW ≠ positive
AC
LOADS
AC VOLTAGE
AND FREQUENCY
AC CURRENT
H
N
TEMPERATURE
SENSOR
can be connected in
either order
BATTERY
1
To Battery Switch
EXTERNAL SHUNT
Battery Side Load Side
AC
COIL
BACK OF
THE METER
Fuse (0.5 Amp)
Install shunt for DC current measurement:
IMPORTANT!Theshuntmustbeinstalledinthenegativelinetoavoid
damage.Positivevoltageappliedtoterminals#9and#10willcausedamage
tothemeter.
InstalltheshuntatanypointintheDCnegativefeedline.Shortsense
wiresminimizevoltagelossandinterference,andresultinthemost
accuratemetering.
Theremustbenoloadsconnectedtothebatteryterminalortheshuntof
Battery1ortheAmp-HourFunctionwillnotoperatecorrectly.