User guide

2 Installing Gauge Guard
3 Installing Pulsation Dampener
4 Installing Pump
1 Location
Ÿ Before installing gauge guard, PTFE (or
similar) thread tape should be used on the
male NPT to assure a seal.
Ÿ DO NOT over tighten or use pipe wrenches
on plastic pipe components
Optional Item
Ÿ Remove all pressure from skid system
prior to dampener installation.
Ÿ Install dampener before charging or
pressurizing.
Ÿ DO NOT start system without first
charging or pressuring dampener.
Ÿ Always wear safety glasses and other
appropriate safety equipment when
installing, charging or repairing
dampener.
Ÿ Mount pump to skid using
enclosed hardware.
Ÿ Choose an area located near chemical
supply tank, chemical injection point,
and electrical supply
Ÿ Mount Pump to the skid using enclosed
mounting hardware
Brackets
SS (Qty: 4)
Washer, SS (Qty: 8)
Hex Nut, SS (Qty: 4)
Socket Head
Screw, SS
#10-32 - .5”
(Qty: 4 per pump)
80000-470 Rev. 12/20/2011

Summary of content (2 pages)