INSTALLATION
BUILT
-
IN FIREPLACE INSTALLATION
Figure 7 - Rough Opening for Wall
Installation
Figure 5 - Clearance to Combustibles
Figure 6 - Fireplace Clearances
WARNING: Do not allow any
combustible materials to overlap
the rebox front.
WARNING: Do not allow
combustible or noncombustible
materials to cover any necessary
openings like louvered slots.
WARNING: Never modify or
cover the louvered slots on the
front of the rebox.
Built-in installation of this replace involves
installing replace into a framed-in enclosure.
This makes the front of the replace ush
with wall. If installing a built-in mantel above
the replace, you must follow the clearances
shown in Figure 5.
NOTICE: Surface temperatures
of adjacent walls and mantels
become hot during operation.
Walls and mantels above the
replace may become hot to the
touch. If installed properly, these
temperatures meet the require-
ment of the national product
standard. Follow all minimum
clearances shown in this manual
(see Figure 6).
1. Frame in rough opening. Use dimensions
shown in Figure 7 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 8 (page 11) for the rough
opening. The height is 19", which is the
same as the wall opening above.
2. Carefully set replace in front of rough
opening with back of replace inside wall
opening.
3. Attach gas line to replace gas regulator.
See Connecting to Gas Supply, page 12.
4. Check all gas connections for leaks. See
Checking Gas Connections, page 14.
1/4" Clearance to Facia
3/8" Clearance to Sides, Back and Top
15
5
/
8
"
16"
28"
5"
4"
6"
8"
10"
12"
To
Ceiling
Hood Top
Fireplace
Safe Zone
12"
9"
6"
3"
1
1
/
2
"
1
3
/
4
"
Slope
Factor
19
3
/
5
"
26
1
/
8
"
11"
9
1
/
4
"
15
5
/
8
"