BMKH24M-NDG3 Owners & Installation Manual
Blueridge Owners Manual
30
Document Version: 11/2016
Copyright 2016 Alpine Home Air Products
Single Zone (cont)
• After the copper lines have been connected, and the pressure test is
complete, you may connect your vacuum pump, manifold gauges, micron
gauges and evacuate the lines.
• Once it is confirmed that the joints have a proper connection, pull a vacu-
um down to 500 microns.
• After the vacuum is complete, close manifold gauge valve(s), and open
both the service valves fully, release the refrigerant into the system, and
start the system.
• Ensure the gauges do not show any restriction
• Remove gauges once the system is operating properly.
Vacuuming