BMKH24M-NDG3 Owners & Installation Manual

Blueridge Owners Manual
30
Document Version: 11/2016
Copyright 2016 Alpine Home Air Products
Single Zone (cont)
After the copper lines have been connected, and the pressure test is
complete, you may connect your vacuum pump, manifold gauges, micron
gauges and evacuate the lines.
Once it is confirmed that the joints have a proper connection, pull a vacu-
um down to 500 microns.
After the vacuum is complete, close manifold gauge valve(s), and open
both the service valves fully, release the refrigerant into the system, and
start the system.
Ensure the gauges do not show any restriction
Remove gauges once the system is operating properly.
Vacuuming