Installation & Owners Manual 2017
Blueridge Owners Manual
19
Document Version: 01/2017
Copyright 2017 Alpine Home Air Products
3
Mount the Outdoor Unit
• Mount the outdoor unit to a concrete pad, plastic pad, or wall bracket of
your choice, using the foot holes and bolts.
4
Connect the Copper Lines
• Remove the screw on the right handle of the outdoor unit.
• Slide the cover down to take the panel off and expose the valves.
• Remove the protective screw caps from the valves.
• Connect the pipe joint of the outdoor unit with the flared end of the cop-
per line set. If the copper pipes are not flared already, please reference
the Copper Line Flaring section of this document (page 54).
• Tighten the union nut (compression fitting) by hand.
• Place the open-ended wrench on the pipe joint and place the torque
Img 7 | Footholes located at the botton of the outdoor unit
Installation of a Single Zone Outdoor Unit
Foot Holes
Foot Holes