Installation & Owners Manual 2017
Blueridge Owners Manual
24
Document Version: 01/2017
Copyright 2017 Alpine Home Air Products
3
Mount the Outdoor Unit
• Mount the outdoor unit to your choice of a concrete pad, plastic pad, or
wall bracket using the foot holes and bolts.
4
Connect the Copper Lines
• Remove the screw on the right handle of the outdoor unit.
• Slide the cover down to take the panel off and expose the valves.
• Remove the screw cap of the valves.
• Connect the pipe joint of the outdoor unit with the flared end of the cop-
per line set. If the copper pipes are not flared already, please reference
the Copper Line Flaring section of this document. (See page 54)
• Tighten the union nut (compression fitting) by hand.
Img 11 | Footholes located at the botton of the outdoor unit
Installation of a Multi Zone Outdoor Unit
Foot Holes
Foot Holes