Volume 1.
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D UNPACKING THE ITEM Caution: This device is packed together with items that may be sharp, oily and overly heavy objects. Remove the device from the packaging in a safe manner. Check to ensure all accessories are included with the item while unpacking. If any parts are found to be missing, contact the retailer as soon as possible. Do not throw away the packaging until the item is out of the guarantee period.
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D Table of Contents SAFETY 1 PRE-OPERATIONAL SAFETY CHECKS OPERATIONAL SAFETY CHECKS 1 1 SPECIFICATIONS 2 GENERAL MAINTENANCE 2 ASSEMBLY INSTRUCTIONS 3 OPERATIONS 5 PURPOSE DEVICE ASPECTS TRANSPORTING THE DEVICE SETTING UP THE DEVICE USING THE DEVICE 5 5 5 6 6 PARTS LIST 7 BREAKDOWN VIEW 8
6 1 8 - 6 ” P I P E V I C E T R I P O D 1 Chapter S T A N D Safety DO NOT USE THIS DEVICE UNLESS YOU HAVE READ THE OPERATING INSTRUCTIONS! Safety glasses must be worn at all times in work areas. Use a full face mask whenever possible. Long and loose hair must be contained. Appropriate footwear must be worn. Close fitting/protective clothing must be worn. Safety gloves should be worn at all times and jewelry must not be worn. Hearing protection should be worn when using this device.
1 2 0 6 T R I P O D S T A N D 2 Chapter Specifications MECHANICAL DATA Pipe Capacity Base Includes Max Pipe Diameter Pipe Benders Jack Screw ½” – 6” Cast Aluminum Slot for Hanging Tools Pipe Rest 6” Max 3 Yes General Maintenance Ø Keep device clean and free of debris. Ø Check for misalignment, binding and breakage of all moving parts. If damaged, repair tool before use. Ø Clean the stand of all dirt and oil as well as the teeth of the jaw with a wire brush.
1 2 0 6 T R I P O D S T A N D 3 Chapter Assembly Instructions Ø Step 1) Insert rear leg assembly (part no. 15) into tray support (part no. 4) as shown in Fig 1. Tighten the set-screw (part no. 13) lightly at this time. Ø Step 2) Slide front leg assembly (part no.14) into tray support, aligning holes in tool tray (part no.3) with holes in front leg assembly. Slide tray pin (part no. 11) through the holes and fix with clip (part no. 12). See figure two below. Ø Step 3) Place Base assembly (part no.
1 2 0 6 T R I P O D S T A N D FIGURE 3 Ø Step 4) Turn the stand right side up and straighten tool tray. Adjust and tighten the set screw (part no. 13) at desired height (see figure 4 below).
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D 4 Chapter Operations Note THOROUGHLY READ THROUGH THE ENTIRE MANUAL BEFORE OPERATING THIS DEVICE! SERVICING SHOULD ONLY BE DONE BY A QUALIFIED TECHNICIAN PURPOSE Ø The purpose of the 618 6” pipe stand is to use for processing pipe.
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D SETTING UP THE DEVICE Ø Locate a clean, level and stable place where the stand will be placed. Ø Place stand with the feet on the floor and slowly open the tripod legs. Carefully push down on the center of the tool tray until the tray is locked into position. o Ø CAUTION: Be mindful of fingers and hands as pinch-points can develop during this procedure. To level the stand, loosen the set-screw on the rear tray support.
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D 4 5 Chapter Parts List Part Number 01 ITEM Base assembly Part Number 16 ITEM Leg chain 02 Leg & tray assembly 17 Screw 03 Tool tray 18 Chain pin 04 Tray support /w screw 19 Handle 05 Screw 20 Swivel nut /w friction ring 06 Leg bolt 21 Friction ring 07 Nut 22 Chain screw 08 Washer 23 Roll pin 09 Jaw 24 Roll 10 Wear plate 25 Chain assembly 11 Tray pin 26 Pin 12 Clip 27 Cap 13 Set screw 28 Jack screw
6 1 8 - 6 ” P I P E V I C E T R I P O D S T A N D Breakdown View 8