Instructions / Assembly

635 W. Michigan Street Orlando, FL 32805 · PH 407-426-7674 · Fax 407-426-7721
Page 2 of 8
A. Bracket Template 1 each
B. Stone Wall Bracket 1 each
C. Remote 1 each
D. Reservoir Wall Bracket 1 each
F. Water Diffuser 1 each
G. Trim Kit (your color may be different) 1
each
I. River Rocks 1 each
J. Hardware Bag with scrubby pad
K. LED Light Kit with cord 1 each
L. Reservoir 1 each
M. Pocket Clips 2 each
N. Rock Tray 1 each
O. EVA Reservoir Pads 2 each
1. Carefully remove and inspect all your Classic Quarry components from its shipping carton. Do not install or
operate unit if any parts are damaged. Please retain all packaging until your unit is installed correctly and
running successfully. You may leave the stone on the pallet until ready to hang.
2. It is very important to rinse your stone clean of any dust or chips that may have accumulated during shipping prior
to assembling your fountain.
3. Tools required: Level, Pencil, stud finder, drill with Phillips bit, Phillips Screwdriver, and Measuring Tape.
4. The use of distilled water is strongly suggested You wil need 5 gallons of distilled water for Nojoqui Falls and 5
gallons for Horizon Falls.
Parts List
Not Shown - Classic Quarry Stone
Section 1: Initial Prepping