Instructions / Assembly

635 W. Michigan Street Orlando, FL 32805 · PH 407-426-7674 · Fax 407-426-7721
Page 3 of 8
Fig 2.1
Fig 2.2
Fig 2.3
Fig 2.4
1. Your Nojoqui Falls fountain is 58” tall x 25.5” wide
the Horizon Falls fountain is 33 tall x 51 wide.
Determine where on the wall the fountain will be
mounted. You may wish to block out the
dimensions with low tack or painters masking tape
for reference. The fountain must be mounted into
studs, wood or metal. Using the stud finder locate
and mark the position of the vertical and horizontal
studs within the blocked out installation area.
Once the studs have been located, the brackets
can be installed.
2. Mark the center of the fountain’s width (Nojoqui Falls is 12.75” - half the 25.5”overall fountain width) and (Horizon
Falls center is 25.5half the 51overall width) for reference. Using your level mark this line vertically within the
installation area.
3. Identify the Bracket Template (A) from the fountain components. The top of the bracket (A) will rest
exactly 4” down from the overall height of your fountain. Using the center mark of the fountain’s width
place the Bracket Template‘s (A) upper keyhole so you can see the center line through the hole. The
keyholes should be in this position (Fig 2.1). Mark the top keyhole.
4. Using a Phillips screw driver and a small screw from your Hardware Bag (J) set the screw in the wall so that ¼” is
left protruding. Hang the Bracket Template (A) from this screw (Fig 2.2) making certain the keyhole is in the
position shown in Fig 2.1.
5. Using the level make certain the Bracket Template (A) is vertically level and mark the placement of the lower
keyhole. Remove the Bracket Template (A).
6. Again using a Phillips screw driver and a small screw, set the screw in the lower keyhole mark so that ¼” is left
protruding.
7. Hang the Stone Wall Bracket (B) from the center keyhole on the upper screw. Note the position of the marked wall
studs through the numerous bracket holes. (Fig 2.3)
8. Place the level on the top of the Stone Wall Bracket (B) insuring it is level (Fig 2.3). Mark the holes that align with
the wall studs. The ideal bracket installation would include screws located at the bracket’s left top and bottom, right
top and bottom and center. If you do not have studs at these locations you will need to use the EZ Anchors™ (J) to
complete the Stone Wall Bracket (B) installation at these locations. Remove the keyhole screw as it will interfere
with the installation of the stone.
9. Repeat this procedure for the Reservoir Wall Bracket (D) (Fig 2.4). Remove the keyhole screw when finished.
Section 2: Mounting the Wall Brackets