User guide

ISTA/P - User Documentation Page 97
Vehicle Programming in Service Applications of 131
Copyright © BMW AG/ISTA/P - User Documentation
Version V2.31.0/August 08
Determine measures plan
User action Result
Select "Determine measures plan".
The "Measures plan", "Control module
tree", "Action list", "Order list" and
"Enable code list" tabs are shown.
The measures plan is shown in the menu
window. Control modules that are to be
processed are identified by a yellow
symbol. A red symbol indicates
replacement or installation of a control
module. No action is planned for the
control module if no symbol is shown. The
actions are indicated as follows:
P Programming
C Encoding
I Initializing
M Installing
R Replacing
U Removing.
Select "Measures plan" tab.
The measures plan is shown in the print
view.
www.bmwicom.net