Pre-Installation Instructions Installation Instructions Prelude The Boann Reverse Osmosis 5-Stage Water Filtration System has been designed as a Do-ItYourself filtration system. However, it is recommended to acquire the services of a licensed professional to facilitate and expedite the installation process. To ensure a successful installation, as well a fully-operating filtration system, carefully read this manual and follow all operational guidelines.
Table of Contents Table of Content Installation Instructions for Reverse Osmosis 5-Stage Water Filtration System Pre-Installation Instructions ........................................................................................................ 2 Installation Instructions Prelude ...........................................................................................................2 Reverse Osmosis 5-Stage Water Filtration System Specifications ................................................
Package Contents Take Everything Outside of the Box Examine the contents inside the box and make sure you have all required parts and accessories to complete the installation process. Parts Diagram 1 Drain Clamp ACW-2 Water Feed Connector AB-3-4 Auto Leak Detector 5 Gal. Pressure Storage Water Tank Parts Diagram 2 Faucet Adapter LS-FA04-716 1/4” Manual Shut Off Valve AVB-2-2B D103 NSF Faucet D103 NSF Faucet Parts Parts Diagram 3 Needle Valve NSV-1 (Optional boannstyle.
Product Overview Boann Reverse Osmosis 5-Stage Water Filtration System FOR VISUAL REFERENCE PURPOSE ONLY: Provided below are images showing the front and rear of the filtration system, with filters intact. We recommend to thoroughly read the installation instructions step by step in order to expeditiously and correctly complete the installation process. System Front View: System Back View: 5 boannstyle.
System Operation Filtration Chart How Does RO System work? Stage 5: Stage 4: Stage 3: Improves water purity by reducing chlorine & odor Reduce 98% of dissolved minerals, salts and most harmful chemicals Ultrafiltration: Chlorine, Bad taste, Odo Post Carbon Filter Purified Water RO Membrane Filter Stage 2: Carbon Pre-Filter Granulated Activated Carbon Pre-Filter Microfiltration: Chlorine, Odor, Organic Chemicals Stage 1: Sediment Pre-Filter Particle Removal: Sand, Silt, Dirt, Rust particles W
Installation Preparation Prepare Space for the Filtration System Before installation is initiated, it is advisable to clean out space underneath the sink in which the filtration system will be installed. Evaluate the area underneath the sink and determine the proper location for the unit and tank. Please consider easy accessibility, as it is required to periodically service the filtration system and its parts.
Installation Preparation Preparing the Feed Water to the System Underneath the sink are located the water supply shut off valves to the Hot and Cold water lines. Before installation commences, please SHUT OFF the main water supply line and the Hot and Cold water valves. After, turn on the sink cold water tap to make sure there is no water flowing from the sink faucet. At this point there should be no water flowing.
Installation Preparation Installing the Feed Water Connector 2. After the cold water hose is detached, use the wrench to unscrew the cold water valve from the cold feed water pipe. Turn Off Cold Water Valve (Turn Clockwise) 3. Thoroughly attach the Manual Shut Off Valve to the Water Feed Connector with wrench. Tighten the Water Feed Connector to the cold feed water pipe, followed by the connection of the cold water valve onto the Feed Water Connector. 3.
Installation Preparation Connecting the Feed Water Line to the Filtration System Depending on the proximity and distance of the filtration system to both the Auto Leak Detector and cold water valve, measure the distance between each component and carefully cut the red PE tubing in half. Take one piece and firmly insert one end into the Inlet port located on the rear of the system. Attach the other end to the R.O. System Out port on the Auto Leak Detector.
Installation Preparation The Auto Leak Detector Advantage The Boann Reverse Osmosis 5-Stage Water Filtration System comes exclusively with an Auto Leak Detector module, which is an invaluable part of the system and serves to detect the presence of water (leakage) around the system.
R.O. Filtration System Installation Preparing the Discharge Water Drain Clamp Find the location on the drain pipe under your sink where you wish to secure the Discharge Water Drain Clamp. CAUTION: Make sure the location chosen is above the Trap. (The Trap is the “U” shape part of the drain pipe) You may secure the saddle clamp on the horizontal pipe, as long as the clamp is above the Trap. It is also advisable to secure the drain clamp in a location that it is not blocking anything. 1.
R.O. Filtration System Installation 3. Adhere the gasket to the interior of the Discharge Water Drain Clamp. Now stick the black PE tubing into the drain clamp, making sure the tubing is protruding through at least 1/2 inch. 4. Now firmly secure the Discharge Water Drain Clamp in its chosen location, making sure the tubing is inserted into the drain pipe by 1/4 inch (as shown). 5. Assemble the two pieces of the Discharge Water Drain Clamp with use of the two screws and bolts.
R.O. Filtration System Installation Prepare the R.O. Pressure Storage Water Tank The R.O. Pressure Storage Water Tank has both an air and water bladder built inside it. The air bladder comes pre-set from the factory at 7 PSI. NOTE: Changes to the PSI of the air bladder inside the water tank may cause harmful back pressure which can result in damage to the R.O. filtration system. Connecting the R.O. Pressure Storage Water Tank 1. Screw the Tank Ball Valve onto the threads located on top of the water tank.
R.O. Filtration System Installation Installation of Push-In Standard Faucet At this point the blue PE tubing will be used to connect the R.O. filtration system to the faucet. The length of tubing used to hook up the kitchen faucet should be long enough to connect to the Faucet input port. Take a moment to assess and measure the amount of tubing required for the application. Once an accurate measurement is taken, cut the blue PE tubing with scissors or a sharp knife.
R.O. Filtration System Installation Installation of Standard Faucet At this point the blue PE tubing will be used to connect the R.O. System to the faucet. The length of tubing used to hook up the kitchen faucet should be long enough to connect to the Faucet input port. Take a moment to assess and measure the amount of tubing required for the application. Once an accurate measurement is taken, cut the blue PE tubing with scissors or a sharp knife. Make certain the cut is straight and not at an angle.
R.O. Filtration System Installation Initiating the Water Filtration System Opening All Water & System Valves At this point in time, you can now turn on the home water main supply line back to its ON position. Proceed to turn ON both the Hot and Cold water valves and all filtration system valves, including the Manual Shut Off Valve and Tank Ball Valve on top of the R.O. Pressure Storage Water Tank.
R.O. Filtration System Evaluation/Leak Prevention Testing the Water Filtration System After letting the system operate for one (1) hour, turn on the filtration systems faucet and let the water run for about 1-2 minutes. Invariably you will evaluate dark, murky water coming from the faucet. This is normal and reflects loose particulates and carbon dust being flushed out from the system.
Water Filtration Filter Schedule Recommended Filter Replacement Schedule Pre and Post Filters: Defined as the filter stages Pre (before the R.O. Membrane) and Post (after the R.O. Membrane). Stage 1, 2 & 3 Pre-Filters - When to Conduct a Filter Change. Stages 1, 2 & 3 are the filtration system’s pre-filters which need to be changed approximately every 1,000 gallons or every 6-months.
Filter Replacement Guide Quick Twist Visual Guide - Filter Replacement Step 1 Lift up filter approximately 30-degrees from R.O. filtration system. Step 2 Twist filter counter-clockwise and gently remove the filter from the filter housing. Step 3 Twist on replacement filter and position back into place. boannstyle.
Filter Replacement Instructions Pre-Filters - How to Perform a Filter Replacement Depressurizing Your System Before filter replacement is to be executed, you must depressurize the filtration system. To do so, please implement the following steps. 1. Shut off the flow of water to the feed water supply line of the system with use of the Manual Shut Off Valve, located near the cold water valve. 2. Turn the Tank Ball Valve clockwise, located on top of the R.O. Pressure Storage Water Tank, to its “OFF” position.
Boann Manufacturer Warranty BOANN REVERSE OSMOSIS 5-STAGE WATER FILTRATION SYSTEM PARTS AND SYSTEM WARRANTY INFORMATION LIMITED WARRANTY Boann Reverse Osmosis 5-Stage Water Filtration System is hereby warranted to the original purchaser to be free from defects in material and workmanship for three (3) YEARS from the time of the original purchase, excluding the filtration media (examples – RO Filters, RO Membranes and other such media) as it is typical to change such media approximately every six (6) MONTHS