Specifications

A. Attach one Pulley (26) to Main Base Frame (A) and one Pulleys to Side Base Frame (B) as
shown using:
Two 76 (3/8”x 1 3/4” hex head bolt)
Four 94 (3/8” washer)
Two 91 (3/8” nylon lock nut)
B. Attach two Pulley (34) to Main Base Frame (A) as shown using:
One 72 (3/8”x 3” hex head bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
D. Attach Front Vertical Frame (F) to Main Base Frame (A) as shown using:
Two 64 (1/2”x 3 1/4” hex head bolt)
Four 93 (1/2” washer)
Two 90 (1/2” nylon lock nut)
E. Attach Top Main Frame (G) to Front Vertical Frame (F) as shown using only one bolt:
One 62 (1/2”x 5” hex head bolt)
Two 93 (1/2” washer)
One 90 (1/2” nylon lock nut)
F. Attach Top Main Frame (G) and Pec Dec Frame (H) to Rear Vertical Frame (E) using:
One 65 (1/2”x 3” hex head bolt)*
One 64 (1/2”x 3 1/4” hex head bolt)
Three 93 (1/2” washer)
One 90 (1/2” nylon lock nut)
*NOTE:
The top bolt (65) goes into an internally threaded nut inside the Top Main Frame (G).
2
Be careful to assemble all components
in the sequence they are presented.
STEP
mm
Inch
NOTE:
Finger tighten all hardware in this step. Do Not
wrench tighten until end of step 5.
12
C. Attach one Pulley (26) and Pulley Cable Guide (7) to the middle of the Main Base Frame (A)
One 76 (3/8”x 1 3/4” hex head bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
as shown using: