Specifications
Pec Dec Cable (38)
A. Attach metal ball end of Pec Dec Cable (38) to Right Pec Dec Cam (AQ) and route under
Top Main Frame (G).
B. Attach the other ball end of Cable (38) to Left Pec Dec Cam (AL).
C. Attach Pulley (C1) to flange on Top Main Frame (G) behind Right Pec Dec Cam (AQ) using:
One 76 (3/8”x 1 3/4” hex head bolt)
One 7 (pulley cable guide)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
Route Pec Dec Cable (38) over
Pulley (C1).
D. Attach Pulley (C2) to flange on Top Main Frame (G) behind Left Pec Dec Cam (AL) using:
One 76 (3/8”x 1 3/4” hex head bolt)
One 7 (pulley cable guide)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
Route Pec Dec Cable (38) over
Pulley (C2).
E. Hang Pec Dec Pulley Holder (131) on Pec Dec Cable (38) as shown and install
Pulley (C3) using:
One 76 (3/8”x 1 3/4” hex head Bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
17
Be careful to assemble all components
in the sequence they are presented.
STEP
mm
Inch
NOTE:
All pulleys are the 4 1/4” diameter Pulleys (26), except where noted.
42
Metal Ball End
Metal Ball End
1890mm
6’ 2 1/2”