Instructions / Assembly

3
Fig. 1
Fig. 2
Mounting the Upright Handles:
a.) Once hinges are installed and gate is aligned, place
the alignment template on the gate upright at the
desired height.
NOTE:
Use the 1
1
1
1
2
2
" template for 1
1
1
1
2
2
" gate uprights,
or 2" template for 2" gate uprights.
Ensure the two solid lines of the template are
positioned at the outer edges of the gate upright
(Fig. 1).
b.) Pre-drill two corner holes using a
1
1
1
4
4
" drill bit and
pre-drill one center hole using a
1
1
1
2
2
" drill bit. Repeat
on opposite side of upright (Fig. 2).
c.) Remove and discard templates.
d.) Insert the three prongs of the front handle through
the three pre-drilled holes on the front side of the
upright (Fig. 3).
NOTE:
If using a 1
1
1
1
2
2
" upright, you will use the included
spacer. 2" uprights do not require the spacer.
The remainder of this manual shows the
installation using the spacer.
e.) Align the spacer on the rear face of the upright
though the three prongs of the front handle (Fig. 4).
f.) Install the rear handle by guiding the  at bar of
the front handle into the slotted groove of the rear
handle (Fig. 5).
1
Template
Gate Upright
1/4"
1/2"
1/4"
Solid Lines
Front
Front
Fig. 3
Fig. 4
Fig. 5
Front
Handle
Front
Handle
3 Prongs
Front
Front
of Uprightof Upright
Close-Up of Close-Up of
Rear Handle
Rear Handle
Rear Handle
Flat Bar
Flat Bar
Spacer not Spacer not
shown for detail
shown for detail
shown for detail