Instructions / Assembly

3
Upright
180º
Rail
Determine
location and gate
opening before
installing fence.
Fig. 1
Determine Gate Opening:
Gate opening is determined by width of gate plus
clearance for hinge (
1
1
1
2
2
") plus clearance for latch/drop
rod (Fig. 1) (see latch instructions for details).
1
2
Fig. 2
Fig. 3
Installing the Hinge:
Install the hinge on the rail/gate upright (Fig. 2).
The gate can be adjusted to swing 180 degrees with
either a manual or self-closing feature (Fig. 3).
NOTE:
Pilot holes should not be drilled all the way through
gate upright or rails. Mark a pilot hole using the
hinge and drill with
3
3
3
32
32
" bit. Also drill pilot holes on
short side of hinge.
3
Mount Hinges on Gate:
Mount both hinges to the gate using (6) 1
1
1
1
2
2
" #2 square/
phillips combo screws per hinge (4 on front of hinge and
2 on side) (Fig. 4).
NOTE:
To ensure performance on any gate, additional  ller
may be required.
Cut two 2" spacer blocks to help support the gate
prior to installing hinges to post.
Fig. 4