Operating instructions
32 GMS810-/GMS811-FIDOR · Operating Instructions · 8013911 V1-0 · © SICK AG
Start-up
Subject to change without notice
4.1 Preparation
4.1.1 Check
Check with a leak detector:
Are the external hydrogen supply and the hydrogen connection gas-tight?
After a longer period of standstill (several weeks), also check:
Instrument air supply and fuel gas supply available and clean?
Gas pressures.
Sample gas outlet free from any blockages?
Sampling probe ready for operation?
4.1.2 Procedure
1 Start the peripheral devices (e.g. heated line, sampling probe, catalyst).
If necessary, wait until they are ready for operation (e.g. warming up time).
2 Check the availability of the operating gases (quality, pressure, stock).
3 Switch on the operating gases.
4.2 Start up the FIDOR
1 The FIDOR starts when the power supply is switched on.
2 The green “POWER“ LED on the display of the FIDOR signals that supply voltage is pres-
ent.
– If the green LED does not light:
– Is the mains switch on the rear of the FIDOR switched on?
– Check firm seating of the power plug on the rear of the FIDOR.
– Check the fuse in the mains switch (
p. 64, §8.2).
3 “SICK“ is displayed on the screen.
4 FIDOR heats up.
This can take up to 45 minutes depending on the peripheral devices.
5 The flame ignites automatically.
6 The Measuring display is then displayed (
p. 34, Fig. 6).
7 To go to the menu for the FIDOR:
– Press “MEAS”.
– Press “Menu”.
– Select FIDOR.
8 As long as the measuring system has not yet reached its operational state (e.g.: The
operating temperature has not yet been reached):
–Display: “FIDOR:Heating”.
– Status “Check”.
9 Measuring operation:
– Only the green “POWER” LED lights.
–Display: “FIDOR:MEASURING” (
p. 34, Fig. 6).
– When the yellow LED lights:
p. 64, §8.3.
10 Final stability: After approx. 1 h.
Controls
p. 34, §5.1