Operating instructions

32 GMS810-/GMS811-FIDOR · Operating Instructions · 8013911 V1-0 · © SICK AG
Start-up
Subject to change without notice
4.1 Preparation
4.1.1 Check
Check with a leak detector:
Are the external hydrogen supply and the hydrogen connection gas-tight?
After a longer period of standstill (several weeks), also check:
Instrument air supply and fuel gas supply available and clean?
Gas pressures.
Sample gas outlet free from any blockages?
Sampling probe ready for operation?
4.1.2 Procedure
1 Start the peripheral devices (e.g. heated line, sampling probe, catalyst).
If necessary, wait until they are ready for operation (e.g. warming up time).
2 Check the availability of the operating gases (quality, pressure, stock).
3 Switch on the operating gases.
4.2 Start up the FIDOR
1 The FIDOR starts when the power supply is switched on.
2 The greenPOWER“ LED on the display of the FIDOR signals that supply voltage is pres-
ent.
If the green LED does not light:
Is the mains switch on the rear of the FIDOR switched on?
Check firm seating of the power plug on the rear of the FIDOR.
Check the fuse in the mains switch (
p. 64, §8.2).
3 “SICK“ is displayed on the screen.
4 FIDOR heats up.
This can take up to 45 minutes depending on the peripheral devices.
5 The flame ignites automatically.
6 The Measuring display is then displayed (
p. 34, Fig. 6).
7 To go to the menu for the FIDOR:
Press “MEAS”.
Press “Menu”.
Select FIDOR.
8 As long as the measuring system has not yet reached its operational state (e.g.: The
operating temperature has not yet been reached):
–Display: “FIDOR:Heating”.
Status “Check”.
9 Measuring operation:
Only the green “POWER” LED lights.
–Display: “FIDOR:MEASURING” (
p. 34, Fig. 6).
When the yellow LED lights:
p. 64, §8.3.
10 Final stability: After approx. 1 h.
Controls
p. 34, §5.1