Operating Guide

769-07478 P00 10/11
Operator’s Manual
BL160
2-Cycle Trimmer
NEED HELP? CALL 1–800-800-7310 IN U.S. OR 1–800–668–1238 IN CANADA
IMPORTANT: READ OPERATOR’S MANUAL THOROUGHLY AND FOLLOW THE SAFE OPERATION PRACTICES WHILE OPERATING THE UNIT.
Removing Unit From Carton
Assemble The Unit
Starting The Unit
Place shield onto mount
bracket. Securely screw 2 shield
screws through holes on mount
bracket and into shield. Make
sure screws are tightened equally
so there is an equal gap between
bracket and shield on each side.
Put handle on shaft. Move
handle a minimum 6 inches
away from shaft grip. Insert
bolt and tighten.
Assemble The Unit
Mix thoroughly in separate
fuel can:
3.2 fl. oz. of 2-cycle
engine oil
1 gallon of unleaded
gasoline
NOTE: Do not mix directly in
fuel tank.
Place unit on a level surface.
Fill fuel tank.
Press primer bulb 10 times,
or until fuel is visible
Crouch in starting position. SQUEEZE and HOLD
throttle for ALL further
steps.
Pull rope 5 times. Move choke lever to
Position 2 and squeeze
throttle.
Pull rope 3-5 times to start
engine. Run unit for 30-60
seconds to warm up.
Continue to squeeze
throttle. Move choke lever
to Position 3.
11 2
Remove all contents from
the carton.
4 5 6
18 9
3
Move choke lever to
Position 1.
Continue to squeeze
throttle. Run unit for an
additional 60 seconds to
complete warm-up. Unit
may be used during this
time.
7
Starting The Unit
10
11
12
13
14
Primer
Bulb
10 X
5 X
3-5 X
Choke Lever
Need Help?
Call 1-800-800-7310
DIDN’T START?
Repeat the starting instructions.
IF engine fails to start after 2 attempts,
move choke lever to position 3 and pull
the starter rope until engine starts
IF unit still fails to start, refer to operator’s
manual for additional starting and
troubleshooting information
1 Gallon 3.2 oz
40:1
Choke Lever
Choke Lever
ASSEMBLY TOOLS REQUIRED:
• #2 Phillips screwdriver
Min. 6"
Starter Rope
Fuel Cap
Throttle Control
On/ Off Switch
D-Handle
Cutting Head Shield
Bump
Knob
Inner
Reel
Outer
Spool
Spring
Top Hole
Bottom Hole
Split Wall
Unscrew the bump knob
counterclockwise.
Remove the inner reel and
spring.
Cut one 6-foot (1.8 m) length
of new 0.095” split line
trimming line. Split each end
about 6 inches (150 mm).
Insert the end of one line into
the top hole and the end of
the other line into the bottom
hole.
Wind the line tightly in the
direction shown on the inner
reel. The split wall will divide
the line. Wind the line until it
is completely divided and
about 6 inches (150 mm) of
line remains.
Insert the two 6-inch sections
into the two .095 holding
slots.
11 2
Pass the two line ends
through the eyelets. Place the
spring inside the inner reel.
Insert the inner reel into the
outer spool. Push the inner
reel and outer spool together.
Reloading the Line*
3
4
5
6
7
Hold the inner reel and outer
spool together. Firmly pull the
two line ends to release them
from the holding slots. Screw
the bump knob on clockwise.
Tighten the bump knob
securely.
18
For replacement line, call 1–800-800-7310 or go to
an authorized service dealer.
For single line installation or replacement spool
installation instructions, refer to the Replacing the
Trimming Line section of this manual.
*This is to assist in the reloading of Splitline® only. These instructions
are NOT part of the fast assembly instructions. Line does not need to
be installed on the initial assembly and start-up.
Reloading the Line
Holding Slots
Eyelets
Español — Page 11 English — Page 1Français — Page 5

Summary of content (16 pages)