INSTRUCTIONS Scaffolding Safety Guidelines
IS14133 05/15
4430 Gibsonia Rd. Gibsonia, PA 15044 • USA www.bontool.com
SCAFFOLDING SAFETY GUIDELINES
as Recommended by SCAFFOLDING, SHORING & FORMING INSTITUTE
It shall be the responsibility of all employers and employees to read and comply with the following common sense guidelines which are designed to
promote safety in the erecting and dismantling of scaffolds. These guidelines do not purport to be all-inclusive nor to supplant or replace other additional
safety and precautionary measures to cover usual or unusual conditions. Local, State or Federal statute or regulations shall supersede these guidelines
if there is a conflict and it is the responsibility of each employee to comply.
GENERAL GUIDELINES
I. POST THESE SCAFFOLDING SAFETY GUIDELINES in a conspicuous place and be sure that all persons who erect, dismantle or use scaffolding
are aware of them.
II. FOLLOW ALL STATE , LOCAL AND FEDERAL CODES, ORDINANCES AND REGULATIONS pertaining to scaffolding because they may be more
restrictive. For example, height or width requirements may vary.
III. SURVEY THE JOB SITE—A survey shall be made of the job site for hazards, such as untampered earth fills, ditches, debris, high tension wires,
unguarded openings, and other hazardous conditions created by other trades. These conditions shall be corrected or avoided asnoted in the following
sections.
IV. INSPECT ALL EQUIPMENT BEFORE USING—Never use any equipment that is damaged or defective in any way.
V. KEEP ALL EQUIPMENT IN GOOD REPA IR—Avoid using corroded equipment—the strength of corroded equipment is not known.
V I. INSPECT ERECTED SCAFFOLDS DAILY —or at the beginning of every shift to be sure that they are maintained in safe condition.
V II. NEVER USE EQUIPMENT FOR PURPOSES OR IN WAY S FOR WHICH IT WAS NOT INTENDED.
V III. REPORT ANY UNSAFE CONDITION. NEVER TAKE CHANCES—Do not work on scaffolds if your physical condition is such that you feel dizzy or
unsteady in any way.
IX. WORKING UNDER THE INFLUENCE OF ALCOHOL OR ILLEGAL DRUGS IS STRICTLY PROHIBITED.
X. CONSULT YOUR SCAFFOLDING SUPPLIER—NEVER TAKE CHANCES—Consult manuals and instructions provided by the supplier; scaffolding is
GUIDELINES FOR ERECTION AND USE OF SCAFFOLDS
4. Secure plank to scaffold when necessary.
P. FOR ROLLING SCAFFOLDS THE FOLLOWING ADD(' GUIDELINES AP3/<
1. CASTERS WITH PLAIN STEMS shall be attached to the panel or adjustment
screw by pins or other suitable means.
2 .DO NOT EXTEND ADJUSTING SCREWS ON ROLLING SCAFFOLDS MORE
THAN 12 INCHES.
3. WHEELS OR CASTERS shall be provided with a locking device and kept locked
during erection and dismantling or any time scaffolds are not being moved.
4. SECURE OR REMOVE ALL MATERIAL AND EQUIPMENT from platform before
moving scaffold.
5 . U S E H O R I Z O N T A L D I A G O N A L B R A C I N G n e a r t h e b o t t o m a n d a t 2 0 f o o t i n t e r v a l s
measured from the rolling surface.
6. DO NOT USE brackets or other platform extensions without consideration of
overturning effect.
7. THE HEIGHT OF A ROLLING SCAFFOLD excluding its uppermost guardrails,
must not exceed* four times its smallest base dimension unless it is stabilized
by an engineered counterweight system or some other equivalent means.
8. CLEAT OR SECURE ALL PLANKS.
9. DO NO T ATTEM PT TO MO VE A ROLLING S CAFFOLD W ITHOUT SUFFIC IENT
+(/3²ZDWFKRXWIRUKROHVLQÀRRUDQGRYHUKHDGREVWUXFWLRQV²VWDELOL]HDJDLQVW
tipping.
10. DO NOT RIDE ROLLING SCAFFOLDS.
11. JOINTS shall be restrained from separation.
Q. FOR "PUTLOGS" AND "TRUSSES" the following additional guidelines apply.
1. DO NOT CANTILEVER OR EXTEND PUTLOGS/TRUSSES as side brackets
without thorough consideration for loads to be applied.
2. PUTLOGS/TRUSSES SHOULD BE EXTENDED AT LEAST 6 inches beyond
point of support.
3. PLACE RECOMMENDED BRACING BETWEEN PUTLOGS/TRUSSES when
the span of putlog/truss is more than 12 feet.
R . W H E N D I S M A N T L I N G S C A F F O L D I N G T H E F O L L O W I N G A D D I T I O N A L G U I D E L I N E S
APPLY:
1. CHECK TO SEE IF SCAFFOLDING HAS BEEN STRUCTURALLY ALTERED
in any way which would make it unsafe, and if so, reconstruct where necessary
before commencing with dismantling procedures.
2. VISUALLY INSPECT PLANK prior to dismantling to be sure that they are safe to
work on.
3. COMPONENTS SHOULD BE LOWERED as soon as dismantled in safe manner
so as to protect personnel below.
4 . D O N OT A CC UM UL AT E E XC ES S C OM PO NE NT S O R EQ UI P ME NT o n t he le ve l
being dismantled.
5. DISMANTLED EQUIPMENT should be stockpiled in an orderly manner.
S. FOLLOW ERECTION PROCEDURES AND USE MANUALS.
"These safety guidelines set forth common sense procedures for safely erecting and dismantling scaffolding equipment. However, equipment and scaffolding systems
GLIIHUDQGDFFRUGLQJO\UHIHUHQFHPXVWDOZD\VEHPDGHWRWKHLQVWUXFWLRQVDQGSURFHGXUHVRIWKHVXSSOLHURIWKHHTXLSPHQW6LQFH¿HOGFRQGLWLRQVYDU\DQGDUH
beyond the control of the Institute, safe and proper use of scaffolding is the responsibility of the user and not the Institute."
A. PROVIDE ADEQUATE SILLS for scaffold posts and use base plates.
B. USE ADJUSTING SCREWS or other approved conditions.
C. PLUMB AND LEVEL ALL SCAFFOL DS as the erection pr oceeds. Do not force braces
WR¿W²OHYHOWKHVFDIIROGXQWLOSURSHU¿WFDQEHPDGHHDVLO\
D. BRACING. Each frame or panel shall be braced by horizontal bracing, cross bracing,
diagonal bracing or any combination thereof for securing vertical members together
laterally. All brace connections shall be made secure, in accordance with manufactur-
ers' recommendations.
E. DO NOT CLIMB CROSS BRACES. Use only an access (climbing) ladder, access
steps, frame designed to be climbed or equivalent safe access to scaffold.
F. TIE RUNNING SCAFFOLD TO WALL or structure when the height exceeds* four (4)
WLPHV WKH PLQLPXP VFDIIROGEDVH GLPHQVLRQ 7KH ¿UVW YHUWLFDO DQG ORQJLWXGLQDOWLH
shall be placed at this point. Vertical ties shall be repeated at intervals not greater
than 26 feet. Longitudinal ties shall be placed at each end and at intervals not greater
than 30 feet. Ties must prevent the scaffold from tipping into or away from the wall or
structure.
* :+(16&$))2/'6$5(72%(3$57,$//<25)8//<(1&/26('VSHFL¿F
precautions must be taken to assure frequency and adequacy of ties attaching the
scaffolding to the building due to increased load conditions resulting from effects of
wind and weather. The scaffolding components to which the ties are attached must
also be checked for additional loads.
H. WHEN FREE STANDING SCAFFOLD TOWERS exceed* four times their minimum
base dimension vertically, they must be restrained from tipping.
I . D O N O T E R E C T S C A F F O L D S N E A R E L E C T R I C A L P O W E R L I N E S U N L E S S P R O P E R
PRECAUTIONS ARE TAKEN. Consult the power service company for advice.
J. DO NOT USE ladders or makeshift devices on top of scaffolds to increase the
height.
K. DO NOT EXCEED MANUFACTURERS' RECOMMENDED LOAD RATING.
L. EQUIP AND MAINTAIN ALL PLATFORMS with proper guardrails, midrails, and
toeboards along all open sides and ends of scaffold platforms.
M. ALL BRACKETS shall be seated correctly with side brackets parallel to the frames
and end brackets at 90 degrees to the frames. Brackets shall not be bent or twisted
from normal position. Brackets (except mobile brackets designed to carry materials)
are to be used as work platforms only and shall not be used for storage of material
or equipment. When brackets are used, the scaffold shall be tied to the structure or
otherwise restrained to prevent tipping.
N. ALL SCAFFOLDING ACCESSORIES shall be used and installed in accordance with
the manufacturers' recommended procedure. Accessories shall not be altered in the
¿HOG6FDIIROGVIUDPHVDQGWKHLUFRPSRQHQWVRIYDULRXVPDQXIDFWXUHUVVKDOOQRWEH
intermixed.
O. FOR PLANKING, THE FOLLOWING GUIDELINES APPLY:
1. Use only lumber that is properly inspected and graded as scaffold plank.
2. Planking shall have at least 12 inches of overlap and extend 6 inches beyond
center of support, or, be cleated at both ends to prevent sliding off supports.
3. Fabricated scaffold planks and platforms, unless created or restrained by hooks,
shall extend over their end supports not less than 6 inches nor more than 12
inches.