Operating instructions
08/06    17
Initialisation
Pre-Operational
Operational
Stopped
Einschalten
aus beliebigem
Zustand
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
  After Power On and the initialization, the slaves are in the Pre-Operational state. 
T
he transition (2) is automatic. The system bus master (frequency inverter or PLC/PC)
triggers the transition (3) to Operational state. 
The transitions are controlled via NMT telegrams. 
  The identifier used for the NMT tele
g
rams is "0" and may only be used by the system 
bus master for NMT telegrams. The telegram contains two data bytes. 
  Byte 0  Byte 1   
  CS (Command Specifier)  Node-ID   
    Identifier = 0 
With the statement of the node ID ≠ 0, the NMT command acts on the subscribe
r
selected via the node ID. If node ID = 0, all the subscribers are addressed. If Node-
ID = 0, all nodes are addressed. 
  Transition  Command  Command Specifier   
  (3) , (6)  Start Remote Node  1   
  (4) , (7)  Enter Pre-Operational  128   
  (5) , (8)  Stop Remote Node  2   
 -  Reset Node  129  
 - Reset Communication  130  
  Note:  A frequency inverter defined as a system bus master only transmits the
command "Start Remote Node” with node ID = 0 (for all subscribers).
Transmission of the command is done after completion of the initialization 
phase and the time delay 
Boot-Up Delay 904 following it. 










