0*20ft Garden Metal Garage Shed Installation Instructions W120.5''xD238.6''xH91.3'' Thank you for choosing us! Please let us know if you have any concerns. CHERY INDUSTRIAL www.cheryindustrial.com T: 888-589-8148 E:service@cheryindustrial.com The product comes in one carton.Please install in a leveled place.
Site Selection Avoid overhanging trees as much as possible as leaves will make regular cleaning necessary and broken branches are a potential hazard. l Small trees,bushes or fences nearby can be helpful,acting as a wind break. Site Preparation The site must be prepared so that the base of the shed is level all round and checking with a spirit level is required. The base can be constructed by treated timber or concrete,in order to stop the moisture getting into the shed.
ATTENTION: 1.Please read this instruction carefully before installation and follow it strictly during installation. 2 .Ensure that there are no problems later due to installation errors. 3 . We have prepared extra screws for you to use in case of loss or damage. Installation Notes Please check the quantity of all parts before installation (refer to the Parts Lists) and the appearance of the products. Make sure the product is correct before installation.
Component List Part No Qty 4L Part No Qty 1 14 4R 1 1L No Qty 4 D15 1 15 2 D16 1 2 17 2 D17 1 1R 1 ABL 2 D18 2 2L 1 ABR 2 D19 1 2R 1 ABM 2 D20 2 1M 2 APL 2 D21 1 P1 4 APR 2 E1 4 P2 24 PL 4 E2 4 P4 2 AP2 26 E3 4 P3 2 AP5 3 E4 4 13L 1 AP6 4 E5 4 13R 1 AP7 4 E6 5 A1 1 AP8 2 E7 2 A2L 1 C2 2 E8 4 4 Part
A2R 1 C3 2 E9 2 10R 2 CL 2 E10 24 12L 1 CR 2 F4 20 12R 1 CM 2 F1 920 10L 1 C4 4 F14 4 11L 2 D1 2 F5 62 11R 1 D2 4 F6 200 9L 1 D3 2 F15 4 9R 1 D4 2 F2 122 15L 1 D5 1 F3 62 15R 1 D6 1 F16 12 16 1 D7 4 F8 302 10M 2 D8 4 F7 766 11M 2 D9 3 RC2 4 A3 1 D10 4 RC3 4 18 1 D11 1 GF 4 5
19 1 D12 2 RT3 2 20 2 D13 1 GD 2 21 4 D14 1 S1 9 15M 1 GB 2 GE 11 F12 6 F17 6 6
1. Base installation 1. Connect 1R, 1M, and 1L with F1 screws, and then install E5 and fix it with F1; 2. Fix 4L and 4R with F1, and then install E5 with F1; 3. Connect 1L, 1M, and 16 with F1, and then install E5 and fix it with F1; 4. Fix 2L, 15,17,2R with F1 connection; 5.
is ize s tion 116'' a l l ta ly ins mate e Th roxi p ap Th ap e ins pro ta xim llat ate ion ly size 23 3'' is Fix with expansion screws after size confirmation 18
2. Framework installation 1. Install P1 on the base using F1 and F7; 2. Fix P2 with F1 and F7, 9L, 9R, 12L, 12R, and F1; 3. Fix 10L, P1, P3 with F1 and F7; 11R, P1, P3 are fixed with F1 and F7. Install 21 onto 2L and secure with F1; Use F1 to install 20 and 21, then install 13L onto 20 and secure with F1 and F7. Fix 10R, P1 and P3 on the other side with F1 and F7; 11L, P1, P3 are fixed with F1 and F7.
Part No Qty P1 Part No Qty 4 22R P2 2 12R No Qty 1 E1 4 A2L 1 E2 4 1 A2R 1 F1 172 12L 1 A1 1 F7 78 9R 1 10M 2 F2 52 9L 1 11M 2 F6 64 10L 1 ABR 2 F16 12 10R 2 ABM 2 11L 2 E8 4 11R 1 E3 4 P3 2 21 4 E10 24 ABL 2 A3 1 E9 2 19 1 E4 4 20 2 E5 4 20 Part
Note:F1 and F7 will not be installed at the overlap of the panel temporarily.
Manually fold inward, Manually long on top. fold inward, long on top. Manually fold inward,with the shorter one below.
Side with 3 holes facing downwards 27
3. Roof Frame Installation 1. PL clamp APR and APL, connect and fix them with F2 and F6, and install the components onto A2L, A2R, A1 and fix them with F1; 2. Fix ABR and ABL with F2 and F6, then insert them diagonally into APR and APL, mount them on PL, fix them with F2 and F6, and then connect the other end into slots E1 and E2, and fix them with F2 and F6. Fix CL, CR, C2, C3 with F2 and F, and fix the other end of CL, CR, E1, E2 with F2 and F6; 3.
Install ABM from top to bottom 34
4. Wall Panel Assembly 1. Fix P2 and P4 with F1 and F7; 2.
Manually fold inward,long on top Manually fold inward,with the shorter one below 38
5. Roof Panel Installation 1. Fix GF with F4 on APL and APR; 2. Install AP2 onto ABR, ABL, CR, CL, ABM, CM, and secure with F1 and F7. For every 4 AP2 installed, install AP5 onto AP2 and secure with F1 and F7. 3. Insert C4 into the middle hole between the first and last tiles, and fix it with F1 and F7. 4. Fix AP6, RT3, RC2, AP7, AP8, and RC3 with F1 and F7.
Whenever four AP2 modules are installed, start installing AP5 and secure with F1 and F7 42
When installing to the last panel,overlap two panels to ensure that the front and rear exposed dimensions are consistent. Insert C4 into the middle hole between the first and last panel and fix it with F1 and F7.
6.
Side door installation The screws do not need to be locked tightly. After adjusting the size to 29'', lock it tightly.
After aligning the lock buckle with the lock head, tighten the screws 49
Left front door installation The screws do not need to be locked tightly temporarily.
r te af 3'' ws o 4 re t sc size e th the n te ng gh ti Ti djus a 51
Right front door installation r te af 3'' ws 4 re t o sc size e th the n te g gh tin Ti jus ad 54
7. Final assembly 1. Remove 2 pieces of 17 if needed. 2.
This accessory is a supplementary part for door installation When the hinge can not lock tightly Use L1 and R1 to adjust. When the ground is uneven or door inclined. Put R2 outside to adjust. Right Door 1.When the hinge can not lock tightly. First remove the F11 screw on the D14 on the right door, and then put R1 inside of D14 and lock with S1 and F11. Then install D14 on the door. 2.When the ground is uneven or door inclined. Put R2 outside of D14 and lock with S1 and F11.
Left Door 1.When the hinge can not lock tightly.First remove the F11 screw on the D6 on the left door, and then put L1 inside of D6 and lock with S1 and F11. Then install D6 on the door. 2.When the ground is uneven or door inclined. Put R2 outside of D6 and lock with S1 and F11.According to the gap of the door to determine the required QTY of R2.