Specifications
9 
Figure3-5 System Wiring Review 
Step 6: Install Fuses 
Install a more than15 Amp DC-rated fuse in each fuse holder in the following 
order: 
1.  Load circuit 
2.  Battery circuit 
Step 7: Confirm Power-up  
When battery power is applied and the TRACER powers up, the battery led 
indicator will be green.   
If the TRACER does not power up or  battery status LEDs error exists, refer to 
Section 5 Troubleshooting 










