Installation Guide

EN
19
Installation
www.bora.com
4.4  Assembly instructions
4.4.1  Safety clearances
 Maintain the following safety clearances:
1
3
2
Fig. 4.3   Minimum distance
[1]  Minimum clearance of 50 mm at the front and back from 
the worktop cut-out to the edge of the worktop.
[2]  Minimum clearance of 300 mm from the left and right of the 
worktop cut-out to the adjacent cabinet or wall.
[3]  Minimum clearance of 600 mm between the worktop and 
cabinet above (650 mm in the case of gas devices).
4.4.2  Worktop and kitchen units
 Create the worktop cut-out taking into account the 
specified cut-out dimensions.
 Make sure that the cut surfaces of the worktops are 
properly sealed.
 Comply with the instructions of the worktop 
manufacturer.
Cross bars on the kitchen unit in the area of the 
worktop cut-out may need to be removed.
No false floor is necessary below the cooktop. If cable 
protection (false floor) is planned, the following must 
be taken into account:
It must be fitted in such a way that it can be 
removed for maintenance work.
To ensure sufficient cooktop ventilation, a minimum 
distance of 15 mm to the bottom edge of the 
cooktop extractor is to be observed.
The drawers and/or shelves in the floor unit must be 
removable.
For correct installation, the slide-in units of the 
base cabinet must be shortened depending on the 
installation situation.
 Do not under any circumstances install parts which are 
damaged.
 Dispose of transport packaging in the proper manner 
(see the Decommissioning, disassembly and disposal 
chapter).
4.2.1  Scope of delivery of the cooktop 
extractor
Scope of delivery CKA2 Quantity
Installation instructions 1
Operating instructions 1
Extractor base module (CKA2GM) 1
Air inlet nozzle (CKA2ED) 1
Grease filter unit (CKA2FFE) 1
Control unit (CKA2SB) 1
Power supply cable (country-specific) 1
Flexible module (CKA2MF) 1
Ferrite sleeve (UFK) 1
Tab. 4.1  Scope of delivery of the cooktop extractor
4.2.2  Scope of delivery of the cooktops
Scope of delivery CKFI, CKI, CKIW, CKCH, CKCB, CKG, 
CKT
Quantity
Cooktop 1
Mounting brackets 4
Height adjustment plate set 1
Additional scope of delivery CKFI, CKI, CKIW, CKCH, CKCB
Glass ceramic cleaning instructions 1
Glass ceramic scraper 1
Additional scope of delivery CKG
Cast-iron grate 2
Nozzle set G20/20 mbar natural gas PKGDS2020 1
Flexible gas connection hose, length 500 mm, 1/2” 
external thread(EN14800)
1
Cylindrical/conical transition piece 1
Seal 1
Glass ceramic cleaning instructions 1
Glass ceramic scraper 1
Additional scope of delivery CKT
Tepan spatula 1
Tab. 4.2  Scopes of delivery of the cooktops
4.3  Tools and aids
The following special tools are required to correctly install 
the system:
Screwdriver/Torx screwdriver 20
Black, heat-resistant silicone sealant
Fine saw










