Instructions / Assembly
15
Borroughs Document Number: DOC-ECM-0001
B A
Parts List
Item Descripon Qty
1 Top Shelf 1
2 End Panel 2
3 Hardware Bag—Top Shelf (ECM-0031) each consists of (10) , (10) , (4) , (4) fasteners 1
Top Shelf
Top Shelf Assembly
1. Position Top Shelf on workbench
so that one end is overhanging.
2. Position End Panel outside the
over hanging Shelf and align the
holes.
3. Loosely fasten together with (3)
screws and (3) nuts.
4. Repeat steps 1-3 for other End
Panel.
5. Ensure assembly is properly
aligned and tighten all hardware.
This completes Top Shelf
Sub- Assembly.
A
B
L M










