installation manual

Table Of Contents
Installation | 33
6 720 806 992 (2013/07)Greenstar
Screw the LWCO as far as possible into LWCO adapter located in the
boiler accessory kit. Follow the Hydrolevel Safgard 1100
instructions.
Fig. 20 Installing a LWCO device - LWCO adapter
Push the adapter with the LWCO onto the pipe (step 1) and secure
with the clip (step 2).
Fig. 21 Installing a LWCO device – securing with a clip
Connect the wires of the LWCO ( chapter 6.4, page 46).
5.8 Connecting flue gas accessories
Optional vent systems are:
Twin pipe PVC / CPVC 2" / 3"
Twin pipe PP 3" (80 mm) (M&G DuraVent PolyPro GreenVent system)
Concentric PP 3" / 5" (80/125 mm) (M&G DuraVent PolyPro
GreenVent system)
In case of using the twin pipe adaptor:
Install the vent flange and gasket with the screws enclosed.
Fig. 22 Attaching the vent flange and gasket
[1] Gasket
[2] Vent flange
[3] Screws
Insert the flue gas adapter as far as it will go into the vent flange and
align it.
Fig. 23 Flue gas adapter
[1] Vent flange
[2] Flue gas adapter
[3] Combustion air test port
[4] Flue gas test ports
Tighten the screws.
The LWCO is positioned upright for technical reasons.
Tests have shown that all air will bleed from the pipe
during commissioning and full functionality is
established.
If fault d3 is displayed when commissioning the boiler,
purge the boiler properly and check the boiler water
pressure.
6 720 641 933-64.1O
6 720 641 933-65.3O
1
2
Ø
1
Ø
2
Ø
1
> Ø
2
The twin pipe adaptor is supplied with the boiler kit as
standard.
1
2
3
6 720 612 737-01.1O
6 720 641 933-85.1O
3
4
1
2