installation manual

Table Of Contents
64 | Inspection and maintenance
Greenstar6 720 806 992 (2013/07)
Loosen/remove pipe connections.
Fig. 80 Removing pipe connections
Remove the boiler pressure gauge from the Heatronic boiler control.
Fig. 81 Removing the boiler pressure gauge
Loosen the quick releases (steps 1 and 2) and remove the hydraulic
assembly in its entirety (step 3).
Fig. 82 Removing the hydraulic assembly
Remove the plate type heat exchanger.
Fig. 83 Removing the plate heat exchanger
Install new plate type heat exchanger with new gaskets and reconnect
the hydraulic assembly in reverse order.
Check all connections used during maintenance for leaks.
14.1.4 Checking the electrodes
Remove electrode set ( page 10 / 12) including gasket and check
electrodes for contamination; clean or replace, if required.
Reinstall electrode set with new gaskets and check for leaks.
Fig. 84 Reinstalling the electrode set
Fig. 85 Check for leaks
6 720 641 933-47.2O
6 720 641 933-48.2O
1.
1.
3.
2.
6 720 641 933-49.2O
6 720 641 933-50.2O
2-1/4 + 3/4 ft.-lbf.
(3 + 1 Nm)
6720641933-28.1O
6 720 613 354-02.2O
Gas/Gaz?