Specifications

6 720 644 063
12
Installation instructions
Horizontal Vent Termination
Fig. 6
Terminate at least 12" (300mm) above grade or
above snow line.
Terminate at least 7' (2.1m) above a public walkway,
6' (1.8m) from the combustion air intake of any appli-
ance, and 3' (0.9m) from any other building opening,
gas utility meter, service regulator etc.
Terminate at least 3' (0.9m) above any forced air inlet
within 10' (3m), 4' (1.2m) below, 4' (1.2m) horizon-
tally from or 1' (0.3m) above any door, window, or
gravity air inlet into any building per National Fuel
Gas Code ANSI Z223.1/NFPA 54.
Slope the horizontal vent 1/4" downwards for every
12" (300mm) toward the termination.
In the Commonwealth of Massachusetts a carbon
monoxide detector is required for all side wall hori-
zontally vented gas fuel equipment.
Vertical Vent Termination
Fig. 7
Terminate at least 6' (1.8m) from the combustion air
intake of any appliance, and 3' (0.9m) from any other
building opening, gas utility meter, service regulator
etc.
Enclose exterior vent systems below the roofline to
limit condensation and protect against mechanical
failure.
When the vent penetrates a floor or ceiling and is not
running in a fire rated shaft, a firestop and support is
required.
When the vent termination is located not less than 8'
(2.4m) from a vertical wall or similar obstruction, ter-
minate above the roof at least 2' (0.6m), but not more
than 6' (1.8m), in accordance with the National Fuel
Gas Code ANSI Z223.1/NFPA 54.
Provide vertical support every 12' (3.6m) or as
required by the vent pipe manufacturer's instructions.
Slope the horizontal vent 1/4" for every 12" (300mm)
towards the drain tee.
A short horizontal section is recommended to pre-
vent debris from falling into the water heater.
Install a condensation drain in the horizontal section
of the venting. For installations in tight spaces where
there is not enough room to install two elbows and a
horizontal drain tee, a vertical drain tee may be sub-
stituted.