Measurement Guide

16
|
Greentherm T9800/9900 SE/SEO/SEi Application Manual
12.2019 | Bosch Thermotechnology Corp.Data subject to change
4.3.3 Multiple tank loading installation
Local code requirements
may require installation
of a thermostatic mixing
valve in some
installations.
NOTE:
110 VAC pump relay
and tank aquastat
field supplied
Hot
Water
Supply
Cold
Water
Supply
NBT-23
Condensate
Neutralizer )
(part# 7 738 005 514)
To drain
or pump
Gas
Storage Tank
Pump
Relay
Legend
Full-port
ball valve
Thermostatic
mixing valve
Union
Check valve
Y-type strainer
Aquastat
Potable
expansion
tank
Pressure
relief valve
Circulator
1) as required by local code.
DISCLAIMER: This drawing is conceptual in nature, not to scale and for reference only. Additional functional, installation, and safety devices may be needed or
required. All work pertaining to the installation shall be in full compliance with all legal requirements, including national and local codes. Best installation practices
should be followed.