Install Instructions
Table Of Contents
- Table of Contents
- 1 Key to symbols and safety instructions
- 1.1 Key to symbols
- 1.2 General safety instructions
- 2 Scope of delivery
- 3 Information about the appliance
- 3.1 Proper use
- 3.2 Overview of boiler types
- 3.3 Rating plate
- 3.4 Appliance description
- 3.5 Accessories
- 3.6 Product dimensions and minimum clearances
- 3.7 Appliance layout heating boiler KBR..-3A
- 3.8 Appliance layout combi boiler KWB..-3A
- 3.9 Electrical wiring heating boiler KBR..-3A
- 3.10 Electrical wiring combi boiler KWB..-3A
- 3.11 Technical data heating boiler KBR 16-3
- 3.12 Technical data heating boiler KBR 21 -3
- 3.13 Technical data heating boiler KBR 28-3
- 3.14 Technical data heating boiler KBR 35-3
- 3.15 Technical data heating boiler KBR 42-3
- 3.16 Technical data combi boiler KWB 28-3
- 3.17 Technical data combi boiler KWB 35 - 3
- 3.18 Technical data combi boiler KWB 42 - 3
- 3.19 Condensate composition
- 4 Regulations
- 5 Common Applications of KBR boilers
- 6 Installation
- 6.1 Installation and operation
- 6.1.1 Notes on installation and operation
- Fill and make-up water for the heating system
- Recommended steps for commissioning a new or retrofit boiler installation
- Recirculation pump/DHW recirculation lines
- Open vented heating systems
- Gravity heating systems
- Galvanized radiators or pipes.
- Plastic pipe work
- Use of a room temperature control
- Primary-secondary piping or a Low Loss Header (LLH)
- Water Chemistry Guidelines
- Corrosion inhibitors
- Boiler sealer
- LPG
- 6.1.2 Other important information
- 6.1.1 Notes on installation and operation
- 6.2 Comparing the size of the integrated expansion vessel (KWB-3A boiler only)
- 6.3 KBR..-3A appliances (heating boilers): Selecting an expansion vessel
- 6.4 Selecting the installation location
- 6.5 Low Loss Header (LLH) utilization
- 6.6 Locating the appliance
- 6.7 Installing a low water cut off (LWCO)
- 6.8 Connecting flue gas accessories
- 6.9 Testing gas and water connections for leaks
- 6.1 Installation and operation
- 7 Making the electrical connections
- 8 Commissioning
- 8.1 Before operating the appliance
- 8.2 Switching the appliance ON/OFF
- 8.3 Setting up space heating
- 8.4 Programming the FW 200 heating control unit (optional accessory)
- 8.5 FW 200 outdoor reset heating control quick start (optional accessory)
- 8.6 After commissioning
- 8.7 KBR..-3A appliances (heating boilers) with DHW tank: Setting the DHW temperature
- 8.8 KWB..-3A appliances (combi boilers): Setting the DHW temperature
- 8.9 Setting manual summer mode
- 8.10 Setting frost protection
- 8.11 Activating the key pad lock
- 9 KBR..-3A appliances (heating boiler) with DHW tank: Thermal disinfection
- 10 Boiler circulator
- 11 Heatronic boiler control settings
- 11.1 Guideline to service functions
- 11.2 Overview of the service functions
- 11.3 Description of the service functions
- 11.3.1 First service level
- Service function 1.A: Maximum space heating output
- Service function 1.b: Maximum DHW output
- Service function 1.E: Pump mode for space heating operation
- Service function 1. F: Pump mode (only heating boiler KBR..-3A)
- Service function 2.A: Heating circuit pump lockout time (only heating boiler KBR..-3A)
- Service function 2.b: Maximum supply temperature
- Service function 2.C: Purging function
- Service function 2.d: Thermal disinfection (legionella protection)
- Service function 2.F: Operating mode
- Service function 3.A: Automatic anti-cycle function
- Service function 3.b: Set anti-cycle time
- Service function 3.C: Switching differential
- Service function 3.d: Minimum output (heating and DHW)
- Service function 3.E: Cycle time, keeping DHW hot (only combi boiler KWB..-3A)
- Service function 3.F: Constant DHW period (only combi boiler KWB..-3A)
- Service function 4.b: Maximum heat exchanger temperature (only combi boiler KWB..-3A)
- Service function 4.d: Audible fault warning tone
- Service function 4.E: Appliance type
- Service function 4.F: Condensate trap filling sequence
- Service function 5.A: Reset inspection interval
- Service function 5.b: Fan post purge time
- Service function 5.E: Functionality of black plug in boiler junction box
- Service function 5.F: Set inspection interval
- Service function 6.A: Display the latest fault code
- Service function 6.b: Room temperature control, current voltage, terminal 2
- Service function 6.C: Supply temperature required by weather compensation control
- Service function 6.d: Current DHW turbine flow rate (only combi boiler KWB..-3A)
- Service function 7.A: Indicator lamp for burner operation / faults
- Service function 7.b: 3-way valve in center position
- Service function 7.d: Connecting an external supply or low-loss header temperature sensor
- Service function 7.E: Building drying function
- Service function 0.A: Do not use this setting!
- Service function 0.d: Altitude adjustment
- Service function 0.E: Metric or US customary units
- 11.3.2 Second service level
- Service function 8.A: Software version
- Service function 8.b: Code plug number
- Service function 8.C: GFA Gas burner control unit status
- Service function 8.d: GFA Gas burner control unit fault
- Service function 8.E: Restore boiler to factory settings
- Service function 8.F: Permanent ignition
- Service function 9.A: Constant mode
- Service function 9.b: Current fan speed
- Service function 9.C: Current boiler output
- Service function 9.d: Set fan start speed
- Service function 9.E: Turbine signal delay (only combi boiler KWB..-3A)
- Service function 9.F: Heating zone pump post purge
- Service function A.b: Display DHW temperature
- Service function A.C: Display DHW tank temperature
- Service function b.F: Solar DHW backup heating delay (only combi boiler KWB..-3A)
- Service function C.d: Display current heat demand
- 11.3.1 First service level
- 12 Gas type conversion
- 13 Flue gas test
- 14 Environmental responsibility/disposal
- 15 Inspection and maintenance
- Heat exchanger
- Heatronic boiler control
- Notes on installation and operation
- After the inspection/maintenance
- 15.1 Description of various steps
- 15.1.1 Calling up the latest fault (service function 6.A)
- 15.1.2 Fresh water filter (only combi boiler KWB..-3A)
- 15.1.3 Plate type heat exchanger (only combi boiler KWB..-3A)
- 15.1.4 Checking the electrodes
- 15.1.5 Burner servicing
- 15.1.6 Heat exchanger block inspection and cleaning
- 15.1.7 Condensate trap cleaning
- 15.1.8 Checking the mixer diaphragm
- 15.1.9 Expansion vessel
- 15.1.10 Setting the boiler water pressure
- 15.1.11 Testing system water quality
- 15.1.12 Inspecting electrical wiring
- 15.2 Checklist for annual inspection and maintenance
- 16 Readings on the display
- 17 Faults
- 18 Commissioning log for the appliance
- 19 Spare parts
- Index
32 | Installation
Greenstar FS
6 720 810 590 (2015/05)
6.2 Comparing the size of the integrated expansion
vessel (KWB-3A boiler only)
The following diagrams allow verifying that the integrated expansion
vessel has sufficient capacity for the intended application, or if an
additional expansion vessel is needed (not for radiant floor heating).
The following standard conditions were used:
• Pre-charge volume 20% of the rated volume in the expansion vessel
• Differential to the safety valve of 7.25 psi (0.5 bar)
• Pre-charge pressure of the expansion vessel equal to the static
system height above the boiler
• Maximum operating pressure: 30 psi (2.07 bar)
Fig. 16 Operating capacity of the expansion vessel in °F and gallons
Fig. 17 Operating capacity of the expansion vessel in °C and liters
Key to Fig. 16 and Fig. 17:
[I] Pre-charge pressure 7.25 psi (0.5 bar) (default setting)
[II] Pre-charge pressure 10.9 psi (0.75 bar)
[III] Pre-charge pressure 14.5 psi (1.0 bar)
t
V
Supply temperature in °F ( °C)
V
A
System capacity in gallons (liters)
A Within operating capacity of the expansion vessel (left of the
relevant curve)
B Additional expansion vessel required (right of the relevant curve)
▶ If results are borderline: Determine precise vessel sizes.
▶ If the results are to the right of the curve: Install additional expansion
vessel.
6.3 KBR..-3A appliances (heating boilers): Selecting an
expansion vessel
External expansion vessel
▶ Determine size of the expansion vessel.
Fig. 18 Sample installation - expansion vessel
6.4 Selecting the installation location
Installation location requirements
Observe the current national and local codes and regulations.
▶ Observe country-specific requirements.
▶ Observe installation instructions of the venting system accessories
and their clearances.
Combustion air
To avoid corrosion, keep the supply of combustion air free of corrosive
substances; contained in solvents, paints, adhesives, propellants and
domestic cleaning agents.
Surface temperature
The max. surface temperature of this appliance is below 185 °F (85 °C).
According to ANSI/Z223.1/NFPA43 (National fuel gas code) and CAN/
CGA B 149.1 (Natural Gas and Propane installation code), the appliance
is approved for zero clearance to combustibles. For servicing a
clearance of 4" (102 mm) is recommended.
200
80
100
120
140
160
180
0 20 40 80 100
120
60
t
V
/°F
V
A
/gal
6720641933-13.1O
A
B
I
III
II
90
30
40
50
60
70
80
0 75 150 300 375
450
225
t
V
/°C
V
A
/l
6720641933-27.1O
A
B
I
III
II
Industrial sources
Chemical cleaning Trichloroethylene, tetrachloroethylene,
fluorinated hydrocarbons
Degreasing bath Perchloroethylene, trichloroethylene,
methylchloroform
Printing shops Trichloroethylene
Hair salons Aerosol propellants, hydrocarbons containing
fluorine and chlorine
(difluorodichloromethane)
Household sources
Cleaning and
degreasing agents
Perchloroethylene, methylchloroform,
trichloroethylene, methylene chloride, carbon
tetrachloride, hydrochloric acid
Workshop
Solvents and thinners Various chlorinated hydrocarbons
Aerosols Chlorofluorinated hydrocarbons
(difluorodichloromethane)
Table 7 Corrosive materials
6 720 810 590-18.1Wo