Installation Manual PHANTOM EDGE Discover the World of AIoT
Table of Contents 2 Sl No. Content Pg No.
List of components Sl No.
Phantom EDGE View 2.1 Front View VOLTAGE INPUT Voltage Input CT INPUT CT Input RS 232 LED Ethernet Indicator 2.
2.3 Left View Hardware ID 2.
Installation Steps 3.1 SIM Card Insertion (Optional) If Wi-Fi connection is not available, use SIM card for it a. LTE 1 Gently pull the flap on its right side to reveal the Micro SIM card slot b.
c.
3.2 Mounting Identify a flat painted wall or metallic surface to mount Phantom Edge. Ensure that Phantom Edge is mounted within 1 meter of radius from the point of CT installation. Phantom Edge can be mounted in the following options: Option A: Mount Phantom Edge in a horizontal direction using sticker b. a. Clean the backside of the device using Iso-Propyl alcohol, peel off the liner from one side of double sided tape and stick it to the backside of Phantom Edge as shown above.
Option B: Mount Phantom Edge on a vertical surface using screws a. Use the Drill Paper Guide and mark the four locations to drill on the target wall c. Insert four wall plugs into the drill holes with the help of hammer 9 b. Drill holes of sufficient depth to accommodate wall plugs provided in the installation kit d.
3.3 Antenna Connection a. LTE 1 E LT 1 Insert LTE antenna 1 into LTE antenna 1 port and rotate the antenna nut in a clockwise direction until it is firm. Ensure not to overtighten. b. LTE 2 E LT Wi-Fi 2 Insert LTE antenna 2 into LTE antenna 2 port and rotate the antenna nut in a clockwise direction until it is firm. Ensure not to overtighten.
c. LTE 2 Wi-Fi Insert Wi-Fi antenna into Wi-Fi antenna port and rotate antenna nut in a clockwise direction until it is firm. Ensure not to overtighten. 3.4 CT Connection a.
b. Towards power supply Line 1 Direction of power flow Towards load Clamp CT around the individual power cable for each phase. Ensure that the front surface of the CT and line label, is oriented in the direction of power source. Ensure color code of the power cable and line label matches. (Refer Exhibit 1) c.
3.5 Voltage Connection a. Identify the MCB switch associated with relevant electrical load/machine b. c. Voltage Connection VOLTAGE INPUT CT INPUT Remove approx. 50mm of insulation from wires. Connect the four-individual wire strands in the voltage connector cable to the appropriate points of the four-pole MCB. Follow color coding of the wire strands to ensure correct connection (Refer exhibit 1).
3.6 RS232 Connection (Optional) Use this option only If you need to collect the data from a device using RS232 port a. RS232 Identify RS232 female connector connected to machine PLC b.
3.7 Ethernet Connection (Optional) Use this option only If you need to collect the data from a device using ethernet port a. Identify the recommended Amphenol RJ45 Cable RCP-5SAMMM-SLM7Bxx male connector connected to machine PLC b.
3.8 Tidy Up a. PHANTOM EDGE Discover the World of AIoT Tidy Up Voltage Connection Ethernet Connection RS232 Connection Use the cable ties to secure and bundle the cables b. PHANTOM EDGE Discover the World of AIoT Voltage Connection Ethernet Connection Tidy Up RS232 Connection Fill in the contact details of local technician and tag it on the voltage cable. Ensure all details are correctly filled for emergency response.
3.
Technical Specification (1/2) Features & Benefits Phantom runs patented AI algorithms on the edge to analyze, interpret and measure asset performance in real time High resolution, granular and real time data available for analytical decision making and actionable insights Introduces digitalization for legacy and modern machines Multiple real-time monitoring use cases across residential, retail, commercial, utility distribution and electrical machines in discrete manufacturing areas.
Technical Specification (2/2) Environmental Conditions Regulatory Compliance Operating Temperature -10 °C to +50 °C EMC Standards Storage Temperature -10 °C to +50 °C EN 301 489-1, EN 301 489-17, EN 301 489-52, IEC 61326-1 Altitude Max 2500 m RF Standards Relative Humidity 10% to 95% EN 300 328, EN 301 511, EN 301 908 -1, EN 301 908-13 IEC Protection Class II (Double Insulation) Safety Construction IEC 61010-1 (CB) IP Degree of Protection IP 64 USA FCC EU CE Pollution Degree 2 Cana
Safety instructions for installation 1. The product must be used by skilled and trained personnel only. Personnel scheduled to be trained, familiarized, instructed, or participating in a general training course may only work with the product under the supervision of an experienced person. 2. Note the ESD handling instructions and handle components with care. 3. Turn off the power supply before connecting Phantom Edge to the LT panel. 4.
Uninstallation & End-of-Life disposal instructions 21 1. Be sure your hands are dry and wear non-conductive gloves, protective clothing, andshoes with insulated soles 2. Turn off the electrical supply before disconnecting Phantom Edge from LT panel 3. Make sure, LT panel is de-energized, by using a tester. When an electric tester touches a live or hot wire, the bulb inside the tester lights up showing that the respective wire is live.
Regulatory Information FCC Regulatory Conformance: FCC Compliance Notification to User: Phantom Edge device comply with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) these devices may not cause harmful interference, and (2) these devices must accept any interference received, including interference that may cause undesired operation.
© Robert Bosch Engineering and Business Solutions Private Limited (RBEI). All rights reserved, also regarding any disposal exploitation, reproduction, editing, distribution, as well as in event of the DSSOLFDWLRQV IRU LQGXVWULDO SURSHUW\ ULJKWV â Robert Bosch Engineering and Business Solutions PVT. LTD. India | Europe | USA | Japan | UK | Middle East | China | Vietnam | Mexico For more information, send your enquiries to Support.Phantom@in.bosch.