Installation guide

21
Attach water line to incoming hot water shut o valve. Turn on water and
check for leaks. Turn power back on at fuse box. Start dishwasher and
listen for water and pump for water distribution. Press Cancel/Reset to
drain and check for leaks.
26
NOTE: If your dishwasher came with a eece kit, follow the
directions supplied in that kit to install the eece.
Attach the metal toe panel (Part I) with screws (Part F) so it is ush with
the oor.
Success! Your installation is now complete.
F
26
I