Instruction manual
39
Commissioning report
Client / Installation address:
Installer:
Heat pump description:
Commissioning date: Heat pump serial number:
Type of ground collector (bore hole, horizontal loop, compact collector):
Total length of collector:
Other components of the installation:
Additional heat source
(boiler, solar etc)
......................................
Room sensor T5 (GT5)
Hot water cylinder
......................................
Hot water cylinder temperature sensor T3
(GT3)
Three-way valve
(mixing valve, zone valve)
......................................
Mixing valve sensor T4 (GT4)
Others: ........................................................................................................................................................................................................
.............
Points to be checked prior to commissioning
Heating system
(pressurised and vented):
fi lled checked
Notes: ......................................................
Collector system
(pressurised and vented):
fi lled checked
Notes: ......................................................
Electric heater 3 6 9 kW:
set checked
Notes: ......................................................
Filters:
checked
cleaned
Notes: ......................................................
Sight glass (green):
checked
Notes: ......................................................
Heating system pump G2 (P2) working correctly:................ Heat transfer fl uid pump G3 (P3) working correctly:................
Temperatures after 10 minutes heating or hot water mode:
Heat fl ow out T8 (GT8): ............./..............˚C Heat return in T9 (GT9): ............./..............˚C
Collector fl uid in T10 (GT10): ........../...........˚C
Collector fl uid out T11 (GT11): ........../...........˚C