Installation manual

610C-001 INSTALLATION MANUAL DOCUMENT No. 070906 REV. 1.2
INSIGHT INSTRUMENT CORP. BOX 122, FORT ERIE, ONTARIO, L2A 5M6
FLIGHT TESTING THE G3
It is essential that the G3 series Display be flight tested.
The GEM must be observed in all phases of flight for consistency in performance. If a problem is noted during
the flight test, discontinue the flight test and trouble-shoot the system.
Should you have any questions or problems during installation or trouble-shooting of the G3 series don’t hesi-
tate to contact Insight Product Support.
More to come!
15/32