User Manual

Guidelines for Trial-phase Implantation
33
6. Grasp the tip of the tool with one hand while holding the straw in
place with the other hand. Pull the tunneling tool shaft out
through the straw.
7. Push the lead or extension proximal ends through the straw, then
withdraw the straw.
8. Wipe clean the proximal end of the lead, then insert the proximal
end into the extension connector until it stops and the retention
ring (long ring) is under the setscrew.
Note: If there appears to be an obstruction, use the torque wrench
to loosen (counterclockwise) the setscrew and/or gently
rotate the lead to help advance the proximal end.
Ensure that the lead is fully inserted before tightening the
setscrew to prevent lead damage.