User Manual

10
Physician Implant Manual
2. Cut the lead extension at the connector.
3. Pull the lead extension through the tunnel and away from body at
the externalized site.
4. Loosen the connector setscrew using the torque wrench provided.
Disconnect and discard the connector.
Note: Connect a new lead extension, if necessary, to reach the
selected IPG site.