Home Gym Assembly Instructions

A-13
Assembly Guide
Step 16 - Attach the Upper Lat Tower to the Lower
Locate the following items:
• From Step 15 - Upper Lat Tower Assembly
• From Step 14 - Main Assembly
• Item #E - (6) 3/8" X 3/4" Button Head Screw
• Item #N - (6) 3/8" Washers
Carefully insert the end of the Upper Lat Tower into the
open end of the Lower Lat Tower. Align the holes on the
Upper Lat Tower with the holes on the Lower Lat Tower.
Place (6) 3/8" Washers (Item #N) over the ends of (6) 3/8"
X 3/4" Button Head Screws (Item #E) - one washer per
screw. Thread the screws into the aligned holes, as shown in
Figure 16
.
Completely tighten hardware installed during Step 16.
Step 17 - Attach the Rod Box with Power Rods® to
the Rod Box Frame
Locate the following items:
• Item #24 - Rod Box Frame
• Item #25 - Rod Box with Power Rods®
• Item #B - (3) #10 X 1" Phillips Head Screws
• Item #L - (3) 1/4" Washers
Place the Rod Box Frame (Item #24) and Rod Box with
Power Rod(Item #25) onto one side as shown in
Figure 17. Slide the Rod Box with Power Rods® into the
Rod Box Frame until the Rod Box is completely seated in
the Rod Box Frame.
Place (3) 1/4" Washers (Item #L) over the ends of (3) #10 X
1" Phillips Head Screws (Item #B) - one washer per screw.
Insert the screws through the slot on the Rod Box Frame
and thread into the holes in the Rod Box with Power
Rods
®.
Completely tighten hardware installed during Step 17.
Figure 16
N
E
Upper Lat
Tower
Lower Lat
Tower
Figure 17
L
B
24
25
Slot