Home Gym Assembly Instructions

A-14
Step 18 - Attach the Rod Box Frame to the Lat Tower
Locate the following items:
• From Step 16 - Main Assembly
• From Step 17 - Rod Box/Frame Assembly
Item #K - (2) 3/8" X 5" Button Head Screws
Item #N - (4) 3/8" Washers
Item #O - (2) 3/8" Nylock Nuts
Align the bolt holes on the Rod Box brackets with the bolt
holes on the Lat Tower above the Chest Bar , as shown in
Figure 18
.
Place (2) 3/8" Washers (Item #N) over the ends of
(2) 3/8" X 5" Button Head Screws (Item #K) - one washer
per screw. Insert the screws through the aligned holes. Place
(1) 3/8" Washer and (1) 3/8" Nylock Nut (Item #O) over the
end of each screw and tighten.
Completely tighten hardware installed during Step 18.
Step 19 - Attach the Faceplate to the Main Assembly
Locate the following items:
Item #26 - Faceplate
• From Step 18 - Main Assembly
Item #A - (2) #10 Phillips Head Screws
Position the textured side of the Faceplate (Item #26) against
the Lower Lat Tower. Insert the plastic stems through the
corresponding holes on the Lower Lat Tower, as shown in Figure
19. You may need to push the Power Rods® out of the way to
insert the screws into the holes.
Attach the Faceplate to the Lower Lat Tower by threading
(2) #10 Phillips Head Screws (Item #A) into the stems”.
Do not completely tighten hardware installed during Step 19 -
tighten screws approximately 1/2 of completion. Hardware will
be tightened during Step 20.
Figure 18
O
N
Rod Box
Brackets
Chest Bar
K
Figure 19
A
26
Faceplate
“Stems”
Assembly Guide