Home Gym Assembly Instructions

A-4
Step 3 - Attach the Squat Platform to the Main
Assembly
Locate the following items:
• From Step 2 - Base Platform/Lat Tower (Main) Assembly
Item #5 - Squat Platform
Item #I - (2) 3/8" X 3 1/4" Button Head Screws
Item #N - (4) 3/8" Washers
Item #O - (2) 3/8" Nylock Nuts
Item #Q - (4) Bolt Covers
With the Base Frame/Lower Lat Tower (Main)
Assembly (from Step 2) on the floor, carefully lift up the
front of the unit, then slide the Squat Platform (Rubber-
pad side down) underneath both Legs.
Line up the bolt holes in the brackets on the Squat
Platform with the bolt holes on each Leg (directly behind
the pulleys), as shown in Figure 3a.
Place (2) 3/8" Washers (Item #N) over the ends of (2)
3/8" X 3 1/4" Button Head Screws (Item #I) - one washer
per screw. Insert the screws through the lined-up holes as
shown, then place (2) 3/8" Washers and (2) 3/8" Nylock
Nuts (Item #O) over the end of each screw, securely
tightening them in place.
Completely tighten hardware installed during Step 3.
Place (2) Bolt Covers (Item #Q) over the Nylock Nuts
installed in this step - one cover per nut. Then, place (2)
additional Bolt Covers over the J-bolts, one cover per bolt,
that attach the Pulleys to the Leg, as shown in Figure 3b
.
Figure 3b
Q
Figure 3a
O
5
Base Platform/Lower
Lat Tower Assembly
N
I
Squat
Platform
Brackets
Bolt
Holes
Leg
Assembly Guide