Webs: www.boyelliving.com Tel: (323)982-8955 Email: service@boyelliving.
1、Installation precautions us. 2、Preparation before installation 1. Please read the installation manual carefully before installation. 2. Installation work must be performed by a professional installer. 3.
、Concealed faucet accessories list C1 or No Description Pressure balanced diverter valve A Valve A-1 C2 A-2 Face plate with sealjoint A-3 Diverter knob kit D A-4 Trim cap A-5 Index Sliding bar kit withflexible hose B Flexible hose B-1 B2 B B1 B-2 Hand shower holder B-3 Hand shower C1 Shower arm and flange kit C2 Ceiling shower arm and flange kit D Shower head E1 Bath tub E2 Bath tub waterfall E3 Bath tub waterfall-plus B3 E2 A4 A1 E1 A3 A2 A5 A3 or E3 A5 A4 2
HEAD SHOWER HAND SHOWER Wall COLD WATER HOT WATER BATH TUB 3
、Pipe connection 1. Please drill the holes on the wall for the main body embedded part, hot and cold water inlet pipes as well as shower arm connection pipes according to the basic product dimension drawing as below. 2. Please make hot and cold water inlet pipe, the mixed water outlet pipe connect with control valve, and tighten with the wrench.
、Water testing and sealing testing Head Shower Hand shower Cold Hot 5 Bath spout 5
、The procedure of sealing the wall Tie surface wall Protective cover is roughly even with tile 6
、Installation of control valve Head shower outlet water Hand shower outlet water Bath tub outlet water 7
、Shower sets installation ① or ② ③ 8
、Handle shower installation 9
12. Clearance and maintenance In order to keep the faucet appearance smooth and good performance, please follow the below steps to clean and maintain the faucet. 1. Clean with water and dry with a soft cotton cloth. 2. Use a mild liquid and a colorless glass cleaner to remove surface dirt and scale, also you can use the cleaner without grinding function. 3. Do not use detergents, polishing tools, abrasive cloth, paper towels or scrapers to clean the faucet. 4.