Installation / Operation Instruction Manual

02/04/2021 23 BI810
SYSTEM HOOKUP
LEAD LAG BOILER
NOTE: If system has LMC, both LMC circuits need to be controlled via isolated end switches (field
supplied). If not using LMC, leave factory jumpers in place.
SYSTEM HOOKUP
0 – 10VDC HOOKUP