Installation / Operation Instruction Manual

Table Of Contents
Page 76
8.D.4.a.1.A Base / Drop Load
Base Load – Is the ring rate that must be achieved prior to adding another unit to satisfy the heat demand.
Drop Load – As the demand for heat decreases, this is the ring rate that units turn o󰀨. The last unit to re is
the rst to get turned o󰀨.
Min On Time As the demand for heat increases, this is the delay time prior to ring additional units.
MinO󰀨TimeAs the demand for heat decreases, this is the delay time prior to turning o󰀨 additional units.
8.D.4.b Cascade DHW
To navigate to the Cascade DHW
Conguration Screen, touch the Cascade Icon on
the Congure Screen, then
touch the Cascade DHW Icon on the Cascade Conguration Screen.
Cascade DHW has the same parameters and setup as Cascade CH
NOTE: Cascade DHW applies to water heater (MGV) units only.