Installation / Operation Instruction Manual
ii
Brute
HIGH EFFICIENCY COMMERCIAL BOILERS AND VOLUME WATER HEATERS
SECTION 11
TROUBLESHOOTING
11.A About Lockouts, Holds, and Alerts ................... 84
11.A.1 Responding to a Lockout, Hold, or Alert ...... 84
11.A.2 Viewing the Lockout and Alert Histories ....... 84
11.B Troubleshooting Table ............................... 86 - 94
11.C Diagnostic Tests and Input/Output Indicators .. 94
11.D Lead Lag Follower Diagnostics ........................ 95
11.E Statistics ........................................................... 95
11.F Analysis ............................................................ 95
11.G Control Snapshot ............................................. 95
11.H Operating Sequence ........................................ 96
SECTION 12
REPLACEMENT PARTS
12.A General Information ....................................... 96
12.B Parts List ...................................................96-99
12.C Parts Illustrations ....................................99-106
SECTION 8
USING THE TOUCH SCREEN
8.A The Touch Screen .......................................... 53
8.B Using the Touch Screen ................................. 53
8.C Login (required for some parameters) ............ 54
8.D Verication Process for
Safety-Related Parameters ............................ 55
8.E Checking Individual Parameters ..................... 56
8.F Setting the Date and Time .............................. 57
8.G The Conguration Menu ...................... 58
8.G.1 System Identication & Access ....................... 59
8.G.2 Heat Conguration .......................................... 59
8.G.2.a CH - Central Heat Conguration ................... 59
8.G.2.b Setting Up 4-20 mA Setpoint ........................ 59
8.G.3 Outdoor Reset Conguration .......................... 60
8.G.4 DHW - Domestic Hot Water Cong ................ 60
8.G.5 Warm Weather Shutdown Cong ................... 60
8.G.6 Demand Priority Conguration ....................... 61
8.G.7 Modulation Conguration ................................ 61
8.G.8 Pump Connections ......................................... 61
8.G.9 Statistics Conguration ................................... 62
8.G.10 High Limits ...................................................... 62
8.G.11 Stack Limits .................................................... 62
8.G.12 Anti-Condensation Conguration ................... 62
8.G.13 Frost Protection .............................................. 62
8.G.14 System Conguration ..................................... 62
8.G.15 Fan Conguration ........................................... 63
8.G.16 Sensor Conguration ...................................... 63
8.G.17 Lead Lag Follower Conguration .................... 64
8.G.18 Lead Lag Leader Conguration ...................... 66
8.G.18.a About Lead Lag Operation ........................ 69
8.H Congure for a
Building Automation System ........................... 71
8.I Combustion Setup .......................................... 72
8.J Adjusting CO
2
................................................ 74
SECTION 9
FIRST START UP AND ADJUSTMENT
9.A Filling the Boiler System ................................. 77
9.B First Operation ................................................ 78
9.C Shutting Down the Unit ................................... 78
9.D Restarting the Unit .......................................... 78
SECTION 10
MAINTENANCE
10.A System Maintenance ..................................... 79
10.B Appliance Maintenance
and Component Description ........................... 79
10.C Battery Backup for Date & Time ..................... 82
10.D Gas Conversion .............................................. 83