Installation / Operation Instruction Manual

Page 59
The Conguration Sub-Menus ( ALL 18 )
8.G. 1
__
18
Some of these congurations will require a Login rst.
See Menu 3 on page 54
The Central Heat Conguration Menu ( ) has three
sub-menus and each of them can be reached by
scrolling left or right thru the arrows on the left and
right. See Menu 18. The three sub-menus are
‘Central Heat’, ‘Setpoint’, and ‘Modulation’.
To set up 4-20 mA Setpoint, you will need to go into
the ‘Setpoint’ sub-menu rst and change the Setpoint
source from Local to S2 (J8-6) 4-20 mA. Then go to
the ‘Modulation’ sub-menu and set the Modulation
source to Local. Both Setpoint and Modulation
cannot have their source set as Local.
From the Central Heat Conguration Sub-Menu,
choose either the left or right arrow.
then Click onto ‘Local’.
When using the unit for hydronic heating, a call for
heat must be supplied to the “T-T” terminals found on
TB7 labeled “T-T or Interlock”. Once a call for heat
is established, the control will start the appropriate
(selected) pumps, and begin the ignition process.
8.G.1 System Identication & Access
This sub-menu will display information regarding software,
date codes, model numbers and program name, as well
as giving the installer access to re-name the boiler and
to change the modbus addresses for lead lag operation.
Press the back arrow on the top right corner of the screen
to return to the ‘Conguration Menu’.
8.G.2 Heat Conguration
8.G.2.a CH - Central Heat Conguration
Make sure that CH is Enabled and then press one of the
black arrows (either side) to get to the Set-Point screen.
Press on the ‘Setpoint’ box to make adjustments to
setpoint, and modulation for a single boiler CH demand.
until you are on the ‘Setpoint’ sub-menu,
Menu 18. The Setpoint submenu
8.G.2.b Setting Up 4-20 mA Setpoint
Click onto the down arrow to see further options.
Brute
HIGH EFFICIENCY COMMERCIAL BOILERS AND VOLUME WATER HEATERS