Install Instructions (Venting)
8 238‐49754‐00B2/12
Installingpipeclamparoundpipeevery3feettosupportpipe.Installpipeclampsoneachsideofelbow.
Steeljointconnectorrings(availablefromCentrothermsupplier)mustbeusedateachpipejoint.Theconnectorrings
ensurethatthejointsdonotseparateunderheavyloads.TheseconnectorringsmustbeusedtocomplywithULC‐S636
requirements.Seefollowingphotowiththejointconnectorattachedtothe
pipesections.
Pipeshownwithconnectorring
Step6:Ifanyofthestraightpipesectionsnee dtobecut,useahacksawandmakeastraightcutonthemale
(ungasketed)endofthepipe.Whenmakingthecut,allowforthe2”minimum(51mm)insertiondistanceinsidethe
femaleendofthepipe.Usingarazorknife,deburrtheedgesofthecutpipetomakeanapproximately15degreebevel
toavoidanysharpedgesthatmaydamage
thegasket.
WARNING
Cut pipe edges must be properly deburred. Damage to the gasket from not deburring the edges of the cut male
end may result in the release of dangerous flue products.
WARNING
DO NOT operate vent system without properly
installing Connector Rings.
CentrothermPipeHangers–Clampsattach
toventpipe.
CentrothermConnectorRing.Hooked
bracketoverbottomjointasshown