Winter / Summer Optional Kit

238-47683-00A REV 01/09
INSTALLATION INSTRUCTIONS – WINTER/SUMMER KIT
HYDRONIC HEATING WITH THE SOLAR WATER HEATER
This winter/summer kit provides the necessary components for connections to a boiler. Through the
proper installation of this kit, a boiler can heat the potable water indirectly during the cold season
when the boiler water is normally hot. The potable water can be heated by an electric element during
the warmer months. This increases the boiler efficiency by eliminating the need to heat the boiler
from a cold start during warm months.
It is important that you read and understand these instructions completely prior to installing the kit
components.
Verify that this kit includes the following components:
Label – “To Boiler Return” Label – “From Boiler Supply”
Surface mounted thermostat w/cover Honeywell R845A Switching Relay
ELECTRICAL CONNECTIONS
Before taking any steps to install the kit components, verify that all power is off and that the water
heater is placed properly.
DANGER
Positively assure all electrical connections are unpowered before attempting installation or service of
electrical components or connections of the water heater or building. Lock out all electrical boxes with
padlock once power is turned off.
WARNING
When installed, the water heater must be electrically grounded in accordance with local codes or, in the
absence of local codes, with the National Electrical Code, ANSI/NFPA 70, and /or the CSA C22.1
Electric Code, latest editions.
Failure to properly wire electrical connections to the water heater may result in serious physical harm.
Electrical power may be from more than one source. Make sure all power is off before attempting any
electrical work.

Summary of content (6 pages)