Installation manual

Express
®
Deck Lavatory System EXD-Series
EXD-2N Installation
10 3/2/2012 Bradley Corporation • 215-1542 Rev. F; ECN 11-08-011
Step 7: Adjust the Temperature
NOTE: This valve is NOT factory preset.
Upon installation, the temperature of this
valve must be checked and adjusted to
ensure delivery of a safe water temperature.
Water in excess of 110°F (43°C) may cause
scalding.
1.Loosenthecapscrewabout¼"(4–6
turns) and lift up the cover (do not
remove).
2. Using the cover, turn the cartridge
gentlyuntildesiredwatertemperatureis
reached. Do not turn past stops as this
may damage the unit. Push the cover
downandtightenthescrew.
3. After testing is complete, reinstall panel
toframe.FastenpanelwitheightTorx-
headscrewsprovided(seeFigure2on
page 6).
H
C
Figure 7
Installation Instructions continued . . .